  "edition": "2026-11-09",
  "scope": "34 selected U.S. public-spending accountability cases; not exhaustive or ranked by loss",
  "moneyRule": "Amounts measure different things and must not be summed. Preserve display, basis, period and case cautions.",
  "receiptRule": "The pie measures dollars linked to itemized invoice/payment records in this collection. A total-only file has 0% traced here. This is not the percentage of all public records available or a fraud estimate. Actual receipt population remains unknown.",
  "cases": [
    {
      "id": "california-high-speed-rail",
      "title": "California High-Speed Rail",
      "category": "Transportation",
      "jurisdiction": "California",
      "classification": "Audit findings / delayed delivery",
      "money": {
        "amount": 15622219594,
        "unit": "USD",
        "basis": "Reported program expenditures including Bookend Projects (local assistance), paid invoices, processed unpaid invoices and estimated costs for work performed; not solely cash disbursements",
        "asOf": "2026-06-30",
        "display": "$15.62B"
      },
      "status": "Under construction, with no high-speed passenger service yet. June 2026 reporting lists 65 structures with concrete work complete and 89 miles of guideway earthworks complete across the 119-mile civil-construction area. The 2026 plan models the first full year of Merced–Bakersfield service in 2033.",
      "evidenceSummary": "Official reports document substantial civil construction and schedule and funding risks. The separate OIG travel investigation found $800,900 lacked advance approval in its $1,152,400 approval-review scope. A different, overlapping review scope identified $595,600 in distinct unallowable payments. Imported Authority reports contain $7,672,143,008.77 in selected prime-contractor payment records from November 2018 through September 2026, after excluding repeated or conflicting rows. The archive omits September 2021. They identify payment dates and invoice references, while invoice copies and delivery approvals remain to be connected.",
      "receiptGap": "The approval review covered selected travel payments; the separate unallowable-expense review used a different scope. Neither is a representative sample of the rail program. Their amounts cannot be divided into each other to calculate a loss rate or extrapolated to the program total. Public construction and expenditure summaries do not provide a complete invoice-to-delivery crosswalk here. Dated spending records are imported on this page. The underlying invoice copies, independently accepted milestones, remaining payer scopes and recoveries still need to be connected. Payment timing by itself does not identify avoidable cost.",
      "sources": [
        {
          "title": "Authority August 2026 Capital Outlay Budget and Expenditures Report, page 2",
          "url": "https://hsr.ca.gov/wp-content/uploads/2026/08/FA-Capital-Outlay-Budget-and-Expenditures-Report-August-2026-A11Y.pdf",
          "date": "2026-08"
        },
        {
          "title": "Final 2026 Business Plan",
          "url": "https://hsr.ca.gov/wp-content/uploads/2026/06/2026-Final-Business-Plan-060126-A11Y.pdf",
          "date": "2026-06-01"
        },
        {
          "title": "OIG substantiated consultant travel investigation, revised tables 2 and 3",
          "url": "https://hsr.ca.gov/wp-content/uploads/2026/09/Investigative-Report-2026-Allegations-of-Wasteful-and-Unallowable-Travel-Expenses-for-Contracted-Consultants-A11Y.pdf",
          "date": "2026-09-15"
        },
        {
          "title": "OIG Review of 2026 Business Plan",
          "url": "https://hsr.ca.gov/wp-content/uploads/2026/07/OIG-HSR-Review-of-2026-Business-Plan-A11Y.pdf",
          "date": "2026-07-31"
        },
        {
          "title": "Authority Project Overview",
          "url": "https://hsr.ca.gov/project-overview/",
          "date": "Accessed 2026-11-08"
        },
        {
          "title": "2008 Business Plan technical benefit-cost analysis, page 3",
          "url": "https://hsr.ca.gov/wp-content/uploads/docs/about/business_plans/BPlan_2008_SRC_CBTR.pdf",
          "date": "2008"
        },
        {
          "title": "Authority August 2026 Central Valley Status Report: construction progress and CP4 contract",
          "url": "https://hsr.ca.gov/wp-content/uploads/2026/08/FA-Central-Valley-Status-Report-August-2026-A11Y.pdf",
          "date": "2026-08"
        },
        {
          "title": "California High-Speed Rail prime contractor payment report 2018–2021",
          "url": "https://hsr.ca.gov/wp-content/uploads/2025/05/PrimePaymentNotification-508-2018-2021-A11Y.pdf",
          "date": "Reviewed 2026-11-09"
        },
        {
          "title": "California High-Speed Rail prime contractor payment report 2022",
          "url": "https://hsr.ca.gov/wp-content/uploads/2025/05/PrimePaymentNotification-508-2022-A11Y.pdf",
          "date": "Reviewed 2026-11-09"
        },
        {
          "title": "California High-Speed Rail prime contractor payment report 2023",
          "url": "https://hsr.ca.gov/wp-content/uploads/2025/05/PrimePaymentNotification-508-2023-A11Y.pdf",
          "date": "Reviewed 2026-11-09"
        },
        {
          "title": "California High-Speed Rail prime contractor payment report 2024",
          "url": "https://hsr.ca.gov/wp-content/uploads/2025/05/PrimePaymentNotification-508-2024-A11Y.pdf",
          "date": "Reviewed 2026-11-09"
        },
        {
          "title": "California High-Speed Rail prime contractor payment report 2025",
          "url": "https://hsr.ca.gov/wp-content/uploads/2026/02/2026FEB-PrimePaymentNotification-508-DEC2025-A11Y.pdf",
          "date": "Reviewed 2026-11-09"
        },
        {
          "title": "California High-Speed Rail prime contractor payment report 2026",
          "url": "https://hsr.ca.gov/wp-content/uploads/2026/05/Prime-Payment-Notification-A11Y.pdf",
          "date": "Reviewed 2026-11-09"
        },
        {
          "title": "2016 Business Plan, January 6, 2015 groundbreaking",
          "url": "https://hsr.ca.gov/docs/about/business_plans/2016_BusinessPlan.pdf",
          "date": "2016"
        },
        {
          "title": "California State Auditor 2018-108",
          "url": "https://information.auditor.ca.gov/reports/2018-108/summary.html",
          "date": "2018-11-15"
        }
      ],
      "caution": "Substantial infrastructure has been built. Program expenditure is not a fraud-loss finding. Travel-review categories overlap and cannot be extrapolated to the program; the revised OIG table replaces its earlier calculation.",
      "promise": "The 2008 benefit-cost analysis assumed Phase I revenue service from January 1, 2020; this was a planning assumption, not evidence of a contractual guarantee.",
      "evidenceGroup": "Audit and oversight findings",
      "receiptRequests": [
        "Link contracts, change orders, invoices and payments to independently accepted construction quantities.",
        "Publish approved scope, cost and schedule changes with responsible approvals.",
        "Reconcile contractor payment totals with delivered assets and operational service milestones."
      ],
      "proposedChange": "Release covered project funding in limited stages. Require an independent progress check before the next unearned milestone payment, publish the evidence, and pause future releases when the agreed conditions fail. Pay verified work already owed and protect essential safety and service needs.",
      "traceability": {
        "scope": "california-high-speed-rail",
        "reviewedOn": "2026-11-08",
        "receipts": [],
        "qualifier": "Dated payment or cash-flow records are shown separately on this page. Invoice-to-payment coverage measures this collection only and requires linked invoice documents for the same scope. Reported program expenditures including Bookend Projects (local assistance), paid invoices, processed unpaid invoices and estimated costs for work performed; not solely cash disbursements."
      },
      "costReview": {
        "title": "What did a completed civil package cost?",
        "scope": "Construction Package 4 only — not the full rail program. Original contract including provisional sums, compared with approved invoices through June 2026.",
        "asOf": "2026-06-30",
        "originalUsd": 444247000,
        "approvedUsd": 866093966.95,
        "changesUsd": 421846966.95,
        "completion": "The report lists final contract completion in August 2025. “Guideway complete” means earthworks and rough grading, not an operating railway.",
        "delivered": [
          {
            "label": "Civil structures",
            "completed": 11,
            "total": 11,
            "unit": "structures"
          },
          {
            "label": "Guideway earthworks",
            "completed": 21.1,
            "total": 21.2,
            "unit": "miles"
          },
          {
            "label": "Utilities in this scope",
            "completed": 133,
            "total": 133,
            "unit": "relocations"
          }
        ],
        "limitations": "The original contract is a historical price for its original scope, not an independent valuation of the finished work. The increase equals recorded change orders; their approval alone does not establish reasonable cost. Scope changes, inflation, delay and site conditions need separate review. Some utilities and parcels were descoped.",
        "source": {
          "title": "Authority August 2026 Central Valley Status Report, CP4 overview (page 37)",
          "url": "https://hsr.ca.gov/wp-content/uploads/2026/08/FA-Central-Valley-Status-Report-August-2026-A11Y.pdf#page=37",
          "date": "2026-08"
        }
      },
      "relatableMetric": {
        "value": "+95%",
        "label": "increase in the CP4 contract",
        "kind": "comparison",
        "explanation": "CP4 original contract value versus approved contract value, August 2026.",
        "formula": "(866,093,966.95 / 444,247,000 - 1) × 100",
        "caution": "A single construction contract, not the entire railway. Approved value is not all cash paid and cost growth alone does not establish fraud.",
        "sources": [
          {
            "title": "California High-Speed Rail, Central Valley Status Report",
            "url": "https://hsr.ca.gov/wp-content/uploads/2026/08/FA-Central-Valley-Status-Report-August-2026-A11Y.pdf",
            "date": "2026-08"
          }
        ]
      }
    },
    {
      "id": "california-homelessness",
      "title": "California homelessness program oversight",
      "category": "Housing and homelessness",
      "jurisdiction": "California",
      "classification": "Audit findings / outcome-data gaps",
      "money": {
        "amount": 24000000000,
        "unit": "USD",
        "display": "Nearly $24 billion allocated",
        "basis": "State allocations for homelessness and housing, FY2018–19 through FY2022–23; not verified expenditure or fraud loss",
        "asOf": "FY2018–19 to FY2022–23"
      },
      "status": "Historical April 2024 audit: two of five reviewed programs appeared cost-effective; three could not be assessed for cost-effectiveness because outcome data were insufficient. Later remediation is not assessed here.",
      "evidenceSummary": "The State Auditor found inconsistent tracking of spending and outcomes. Homekey and CalWORKs Housing Support appeared cost-effective; outcome data were insufficient for State Rental Assistance, Encampment Resolution Funding and HHAP. The nearly $24 billion allocation covers a broader set of housing and homelessness programs than the five reviewed.",
      "receiptGap": "This audit does not establish that $24 billion was lost or that all underlying receipts were missing. The collection has not assembled a full payment-to-provider-to-housing-outcome ledger.",
      "receiptRequests": [
        "Reconcile each program allocation to disbursements, local subgrants and provider payments.",
        "Connect provider costs to housing placements and retention, using privacy-protected person-level audit access.",
        "Publish comparable costs, outcomes and follow-up to the 2024 recommendations."
      ],
      "proposedChange": "Connect covered housing grants to provider payments and verified placements. Track sustained housing at six and twelve months while preserving emergency shelter, care and support for people with greater needs.",
      "sources": [
        {
          "title": "California State Auditor Report 2023-102.1: homelessness program cost-effectiveness",
          "url": "https://www.auditor.ca.gov/reports/2023-102-1/",
          "date": "2024-04-09"
        },
        {
          "title": "California State Auditor report 2023-102.1",
          "url": "https://www.auditor.ca.gov/wp-content/uploads/2024/04/2023-102.1-Report.pdf",
          "date": "2024-04-09"
        },
        {
          "title": "HUD 2023 Annual Homelessness Assessment Report, Part 1",
          "url": "https://www.huduser.gov/portal/sites/default/files/pdf/2023-AHAR-Part-1.pdf",
          "date": "2023-12"
        },
        {
          "title": "HCD HHAP fiscal dashboard, all rounds, activity through July 31, 2026",
          "url": "https://www.hcd.ca.gov/housing-open-data-tools/hhap-dashboard",
          "date": "Reviewed 2026-11-09"
        },
        {
          "title": "State funding guide, HHAP implementation and disbursement chronology",
          "url": "https://www.bcsh.ca.gov/calich/documents/putting_the_funding_pieces_together.pdf",
          "date": "Reviewed 2026-11-09"
        },
        {
          "title": "HCD fiscal reporting definitions",
          "url": "https://www.hcd.ca.gov/funding/hhap/reporting",
          "date": "Reviewed 2026-11-09"
        }
      ],
      "caution": "Allocation is permission to spend, not proof of payment. Insufficient outcome data does not establish fraud or justify denying housing assistance.",
      "evidenceGroup": "Audit and oversight findings",
      "traceability": {
        "scope": "california-homelessness",
        "reviewedOn": "2026-11-08",
        "receipts": [],
        "qualifier": "This file currently links summary-level sources, with no itemized invoice-to-payment records registered against this amount. The pie measures this collection only. State allocations for homelessness and housing, FY2018–19 through FY2022–23; not verified expenditure or fraud loss. Preserve the source qualifier: this is not an exact spending denominator."
      },
      "relatableMetric": {
        "value": "≈$26,500/year",
        "label": "annualized allocations per person counted homeless in January 2023",
        "kind": "allocation scale comparison",
        "explanation": "Nearly $24 billion allocated for housing and homelessness over five fiscal years is about $4.8 billion per year. Compare that annual average with the 181,399 people counted homeless on one night in January 2023.",
        "caution": "Scale comparison only. Nearly $24B is allocated funding, not verified spending; it includes housing, prevention and capital programs. The 181,399 count is a one-night snapshot, not everyone served or homeless during a year. This does not mean each person received $26,500 and does not estimate fraud.",
        "sources": [
          {
            "title": "California State Auditor report 2023-102.1",
            "url": "https://www.auditor.ca.gov/wp-content/uploads/2024/04/2023-102.1-Report.pdf",
            "date": "2024-04-09"
          },
          {
            "title": "HUD 2023 Annual Homelessness Assessment Report, Part 1",
            "url": "https://www.huduser.gov/portal/sites/default/files/pdf/2023-AHAR-Part-1.pdf",
            "date": "2023-12"
          }
        ],
        "formula": "($24 billion ÷ 5 fiscal years) ÷ 181,399 people",
        "comparisons": [
          {
            "label": "Annual allocation average",
            "value": "≈$4.8B"
          },
          {
            "label": "Per counted person / month",
            "value": "≈$2,205"
          },
          {
            "label": "Per counted person / day",
            "value": "≈$72.50"
          }
        ]
      }
    },
    {
      "id": "honolulu-skyline",
      "title": "Honolulu Skyline rail",
      "category": "Transportation",
      "jurisdiction": "Hawaii",
      "classification": "Audit findings / cost escalation",
      "money": {
        "amount": 9188000000,
        "unit": "USD",
        "basis": "Historical estimated cost at completion, not actual spending",
        "asOf": "2018-11",
        "display": "$9.19B"
      },
      "status": "Partly operational: HART reports 16 miles and 13 stations operating; remaining construction continues.",
      "evidenceSummary": "The state auditor found inconsistent and opaque contingency reporting as the project estimate grew from $5.122 billion to $9.188 billion. Operating service exists, so this is a delivery and oversight case rather than a never-built railroad.",
      "receiptGap": "Auditor findings describe weaknesses in cost reporting. The sources collected here do not reconcile every contract payment and change order to independently accepted work; no receipt-coverage percentage is established.",
      "sources": [
        {
          "title": "Hawaii Auditor Report 19-03 summary",
          "url": "https://files.hawaii.gov/auditor/Overviews/2019/19-03AuditorSummary.pdf",
          "date": "2019-01"
        },
        {
          "title": "HART Construction status",
          "url": "https://honolulutransit.org/construction/",
          "date": "Accessed 2026-11-08"
        },
        {
          "title": "Honolulu FY2024 audited cash-flow statement, page 63 (PDF page 76)",
          "url": "https://www.honolulu.gov/oca/wp-content/uploads/sites/39/2025/01/ACFR-2024.pdf",
          "date": "Reviewed 2026-11-09"
        },
        {
          "title": "HART begins operations",
          "url": "https://honolulutransit.org/hart-board-of-directors-meeting-7-1-2011/",
          "date": "Reviewed 2026-11-09"
        }
      ],
      "caution": "This is a dated estimated completion cost, not the latest budget, cash paid, or a finding of fraud loss.",
      "evidenceGroup": "Audit and oversight findings",
      "receiptRequests": [
        "Link contracts, change orders, invoices and payments to independently accepted construction quantities.",
        "Publish approved scope, cost and schedule changes with responsible approvals.",
        "Reconcile contractor payment totals with delivered assets and operational service milestones."
      ],
      "proposedChange": "Connect covered contracts and changes to payments and independently accepted milestones. Publish exceptions, recovery progress and reusable assets, with protected information available to independent oversight.",
      "traceability": {
        "scope": "honolulu-skyline",
        "reviewedOn": "2026-11-08",
        "receipts": [],
        "qualifier": "This file currently links summary-level sources, with no itemized invoice-to-payment records registered against this amount. The pie measures this collection only. Historical estimated cost at completion, not actual spending."
      },
      "relatableMetric": {
        "value": "+79%",
        "label": "increase in the estimated completion cost",
        "kind": "comparison",
        "explanation": "Historical completion estimates: $5.122B in 2012 to $9.188B in November 2018; 1.79× the earlier estimate.",
        "formula": "(9,188,000,000 / 5,122,000,000 - 1) × 100",
        "caution": "Estimated completion cost, including financing, not actual spending or a cost per current operating mile.",
        "sources": [
          {
            "title": "Hawaii Auditor, Report 19-03 summary",
            "url": "https://files.hawaii.gov/auditor/Overviews/2019/19-03AuditorSummary.pdf",
            "date": "2019-01"
          }
        ]
      }
    },
    {
      "id": "vc-summer",
      "title": "V.C. Summer Units 2 and 3",
      "category": "Energy",
      "jurisdiction": "South Carolina",
      "classification": "Proven criminal deception / abandoned construction",
      "money": {
        "amount": 9000000000,
        "unit": "USD",
        "basis": "More than $9 billion of project spending before abandonment; combined utility expenditure, not a criminal loss finding",
        "asOf": "2017",
        "display": "Over $9B"
      },
      "status": "Two reactors abandoned unfinished in 2017. Santee Cooper's June 2026 update describes renewed feasibility work with a target final investment decision in first-quarter 2028, not a completed restart.",
      "evidenceSummary": "The SEC complaint describes deception from 2015 through 2017. An April 28, 2015 internal memorandum questioned the schedule and tax-credit eligibility. Bechtel presented an independent warning in October 2015. Publicly misleading progress claims continued in 2016 and 2017, and the project was abandoned in July 2017, about 27 months after the April warning. DOJ later reported four executives sentenced for misconduct connected to the project. The SEC chronology is an allegation in its civil complaint; DOJ convictions establish specific criminal conduct. Separate utility records describe a conditional restart study. A January 2019 regulator filing reports SCE&G’s 55% share of project cash flow by year from 2007 through 2017, separately from capitalized interest. The imported year rows sum to $4,551,186,000 before $85,602,000 of separately listed undated negative transfers. Annual timing limits an exact within-year cutoff.",
      "receiptGap": "Criminal findings prove specific misconduct; they do not supply a complete, publicly reconciled ledger of all project spending, recoveries, ratepayer charges and usable assets. Dated spending records are imported on this page. The underlying invoice copies, independently accepted milestones, remaining payer scopes and recoveries still need to be connected. Payment timing by itself does not identify avoidable cost.",
      "sources": [
        {
          "title": "DOJ: Fourth and final V.C. Summer executive sentenced",
          "url": "https://www.justice.gov/usao-sc/pr/fourth-and-final-vc-summer-executive-sentenced-misconduct-connection-failed-nuclear",
          "date": "2024-11-21"
        },
        {
          "title": "Idaho National Laboratory: Potential Cost Reduction, section 3.2 (DOE OSTI repository)",
          "url": "https://www.osti.gov/servlets/purl/2571083",
          "date": "2025"
        },
        {
          "title": "Santee Cooper: MOU milestones and target investment decision",
          "url": "https://newsroom.santeecooper.com/news/santee-cooper-and-brookfield-asset-management-mou-progresses-key-milestones-met/",
          "date": "2026-06-30"
        },
        {
          "title": "SEC complaint against SCANA et al., paragraph 2 (project expenditure allegation)",
          "url": "https://www.sec.gov/files/litigation/complaints/2020/comp24751.pdf",
          "date": "2020-02-27"
        },
        {
          "title": "PSC filing, restated project cash flow, page 4",
          "url": "https://dms.psc.sc.gov/Attachments/Matter/1f376816-a8fb-45e2-8f30-845933b95332#page=4",
          "date": "2019-01-18"
        }
      ],
      "caution": "The $9 billion is total project expenditure, not a finding that the entire amount was stolen. The operating Unit 1 is separate from unfinished Units 2 and 3.",
      "evidenceGroup": "Proven misconduct",
      "receiptRequests": [
        "Connect federal reimbursements and utility payments to invoices, work packages and accepted engineering milestones.",
        "Publish final termination costs, recovery amounts and the disposition or reuse of equipment and facilities.",
        "Separate taxpayer funding, ratepayer charges and private investment in a reconciled ledger."
      ],
      "proposedChange": "Release covered project funding in limited stages. Require an independent progress check before the next unearned milestone payment, publish the evidence, and pause future releases when the agreed conditions fail. Pay verified work already owed and protect essential safety and service needs.",
      "traceability": {
        "scope": "vc-summer",
        "reviewedOn": "2026-11-08",
        "receipts": [],
        "qualifier": "Dated payment or cash-flow records are shown separately on this page. Invoice-to-payment coverage measures this collection only and requires linked invoice documents for the same scope. More than $9 billion of project spending before abandonment; combined utility expenditure, not a criminal loss finding. Preserve the source qualifier: this is not an exact spending denominator."
      },
      "relatableMetric": {
        "value": "0 of 2",
        "label": "new reactors finished before abandonment",
        "kind": "reported outcome",
        "explanation": "Units 2 and 3 were abandoned in 2017 after more than $9B in project expenditure.",
        "formula": "0 completed / 2 planned new reactors",
        "caution": "Do not imply the existing Unit 1 was unfinished. Spending includes work and assets; zero completed reactors is not a valuation of everything built or evidence all spending was stolen.",
        "sources": [
          {
            "title": "SEC complaint in SEC v. SCANA et al.",
            "url": "https://www.sec.gov/files/litigation/complaints/2020/comp24751.pdf",
            "date": "2020-02-27"
          }
        ]
      }
    },
    {
      "id": "mox-facility",
      "title": "Savannah River MOX Fuel Fabrication Facility",
      "category": "Energy",
      "jurisdiction": "South Carolina / Federal",
      "classification": "Cancelled project / cost escalation",
      "money": {
        "amount": 7000000000,
        "unit": "USD",
        "basis": "DOE summary says over $7 billion already spent at cancellation; rounded lower threshold",
        "asOf": "2018-05",
        "display": "Over $7B"
      },
      "status": "Original mixed-oxide fuel facility project discontinued before operations.",
      "evidenceSummary": "DOE's May 2018 account describes missed construction milestones, ballooning costs and discontinuation, with a completion estimate exceeding $18 billion and more than $7 billion already spent.",
      "receiptGap": "The cited summary distinguishes spent money from completion estimates but does not reconcile every invoice, termination payment, asset transfer or subsequent reuse.",
      "sources": [
        {
          "title": "DOE Nuclear Power Summary, May 2018",
          "url": "https://www.energy.gov/ne/articles/nuclear-power-summary-may-2018",
          "date": "2018-05"
        },
        {
          "title": "DOE OIG Audit Report DOE-OIG-20-16",
          "url": "https://www.energy.gov/ig/articles/audit-report-doe-oig-20-16",
          "date": "2020"
        },
        {
          "title": "DOE 2014 MOX audit",
          "url": "https://www.energy.gov/ig/articles/audit-report-doeig-0911",
          "date": "Reviewed 2026-11-09"
        }
      ],
      "caution": "Cancellation does not establish fraud. Constructed assets may have reuse value.",
      "evidenceGroup": "Delivery failures",
      "receiptRequests": [
        "Connect federal reimbursements and utility payments to invoices, work packages and accepted engineering milestones.",
        "Publish final termination costs, recovery amounts and the disposition or reuse of equipment and facilities.",
        "Separate taxpayer funding, ratepayer charges and private investment in a reconciled ledger."
      ],
      "proposedChange": "Connect covered contracts and changes to payments and independently accepted milestones. Publish exceptions, recovery progress and reusable assets, with protected information available to independent oversight.",
      "traceability": {
        "scope": "mox-facility",
        "reviewedOn": "2026-11-08",
        "receipts": [],
        "qualifier": "This file currently links summary-level sources, with no itemized invoice-to-payment records registered against this amount. The pie measures this collection only. DOE summary says over $7 billion already spent at cancellation; rounded lower threshold. Preserve the source qualifier: this is not an exact spending denominator."
      },
      "relatableMetric": {
        "value": "0 operating plants",
        "label": "after more than $7 billion spent",
        "kind": "reported outcome",
        "explanation": "DOE’s May 2018 summary reported more than $7B spent and construction being ended.",
        "formula": "0 operating plants after more than $7B spent",
        "caution": "The unfinished facility and work performed are not worth zero. This does not label the expenditure fraud.",
        "sources": [
          {
            "title": "DOE, Nuclear Power Summary: May 2018",
            "url": "https://www.energy.gov/ne/articles/nuclear-power-summary-may-2018",
            "date": "2018-05"
          }
        ]
      }
    },
    {
      "id": "kemper-clean-coal",
      "title": "Kemper coal-gasification and carbon-capture project",
      "category": "Energy",
      "jurisdiction": "Mississippi / Federal",
      "classification": "Delivery failure / oversight concerns",
      "money": {
        "amount": 382000000,
        "unit": "USD",
        "basis": "DOE reimbursements to Southern, not the full privately financed plant cost",
        "asOf": "2017-01",
        "display": "$382M"
      },
      "status": "Coal-gasification operations suspended in June 2017; plant was operated as natural-gas generation.",
      "evidenceSummary": "DOE OIG reported approximately $382 million reimbursed by January 2017. DOE and EIA document abandonment of the gasification approach and operation as a natural-gas plant.",
      "receiptGap": "Federal reimbursement, company construction cost, ratepayer recovery and usable gas-generation assets are different accounts. No complete invoice-to-promised-carbon-capture output reconciliation is established by this source set.",
      "sources": [
        {
          "title": "DOE OIG Information Report OIG-IR-17-03",
          "url": "https://www.energy.gov/ig/articles/information-report-oig-ir-17-03",
          "date": "2017-03-17"
        },
        {
          "title": "DOE Southern Company—Kemper County",
          "url": "https://www.energy.gov/hgeo/southern-company-kemper-county-mississippi",
          "date": "Status includes 2017-06-28"
        },
        {
          "title": "EIA: Petra Nova and Kemper project comparison",
          "url": "https://www.eia.gov/todayinenergy/detail.php?id=33552",
          "date": "2017"
        }
      ],
      "caution": "The approximately $7.5 billion total plant cost is broader than federal taxpayer support. These sources establish no fraud adjudication.",
      "evidenceGroup": "Delivery failures",
      "receiptRequests": [
        "Connect federal reimbursements and utility payments to invoices, work packages and accepted engineering milestones.",
        "Publish final termination costs, recovery amounts and the disposition or reuse of equipment and facilities.",
        "Separate taxpayer funding, ratepayer charges and private investment in a reconciled ledger."
      ],
      "proposedChange": "Connect covered contracts and changes to payments and independently accepted milestones. Publish exceptions, recovery progress and reusable assets, with protected information available to independent oversight.",
      "traceability": {
        "scope": "kemper-clean-coal",
        "reviewedOn": "2026-11-08",
        "receipts": [],
        "qualifier": "This file currently links summary-level sources, with no itemized invoice-to-payment records registered against this amount. The pie measures this collection only. DOE reimbursements to Southern, not the full privately financed plant cost."
      },
      "relatableMetric": {
        "value": "65% capture goal",
        "label": "abandoned while the gas plant continued",
        "kind": "reported outcome",
        "explanation": "The project had a planned capture rate of 65%; DOE had reimbursed $382M by January 2017.",
        "formula": "65% planned capture; coal gasification and capture subsequently abandoned",
        "caution": "The natural-gas power plant continued operating. $382M is the federal reimbursement snapshot, not total project cost or a calculated loss.",
        "sources": [
          {
            "title": "EIA, Carbon dioxide emissions from the U.S. power sector have declined 28% since 2005",
            "url": "https://www.eia.gov/todayinenergy/detail.php?id=33552",
            "date": "2017-10-31"
          },
          {
            "title": "DOE Inspector General, OIG-IR-17-03",
            "url": "https://www.energy.gov/ig/articles/information-report-oig-ir-17-03",
            "date": "2017-03-17"
          }
        ]
      }
    },
    {
      "id": "futuregen-2",
      "title": "FutureGen 2.0 plant, pipeline and storage",
      "category": "Energy",
      "jurisdiction": "Illinois / Federal",
      "classification": "Audit findings / cancelled before construction",
      "money": {
        "amount": 200523859,
        "unit": "USD",
        "basis": "Actual DOE funding: $116,666,759 plant plus $83,857,100 pipeline/storage; two distinct awards",
        "asOf": "GAO 2021 review",
        "display": "$200.52M"
      },
      "status": "Both funding agreements terminated before construction.",
      "evidenceSummary": "GAO found DOE exceeded planned early-phase funding and relaxed cost-sharing requirements. The two FutureGen components reached design but were not built.",
      "receiptGap": "GAO provides award-level actual funding and phases, not a complete public transaction-to-deliverable ledger. Design expenditure is not proof no work occurred.",
      "sources": [
        {
          "title": "GAO-22-105111, tables 1 and 3",
          "url": "https://www.gao.gov/assets/gao-22-105111.pdf",
          "date": "2021-12"
        },
        {
          "title": "DOE FY2014 budget hearing, written response, page 71",
          "url": "https://www.govinfo.gov/content/pkg/CHRG-113shrg81214/pdf/CHRG-113shrg81214.pdf",
          "date": "Reviewed 2026-11-09"
        }
      ],
      "caution": "The amount combines two FutureGen 2.0 awards already included in the report’s broader four-project aggregate.",
      "evidenceGroup": "Delivery failures",
      "receiptRequests": [
        "Connect federal reimbursements and utility payments to invoices, work packages and accepted engineering milestones.",
        "Publish final termination costs, recovery amounts and the disposition or reuse of equipment and facilities.",
        "Separate taxpayer funding, ratepayer charges and private investment in a reconciled ledger."
      ],
      "proposedChange": "Connect covered contracts and changes to payments and independently accepted milestones. Publish exceptions, recovery progress and reusable assets, with protected information available to independent oversight.",
      "traceability": {
        "scope": "futuregen-2",
        "reviewedOn": "2026-11-08",
        "receipts": [],
        "qualifier": "This file currently links summary-level sources, with no itemized invoice-to-payment records registered against this amount. The pie measures this collection only. Actual DOE funding: $116,666,759 plant plus $83,857,100 pipeline/storage; two distinct awards."
      },
      "relatableMetric": {
        "value": "2.34×",
        "label": "the planned funding for the phase reached",
        "kind": "comparison",
        "explanation": "Both FutureGen 2 awards, through termination.",
        "formula": "(83,857,100 + 116,666,759) / (46,030,081 + 39,771,244)",
        "caution": "Design-phase funding comparison, not full plant budget or measured fraud.",
        "sources": [
          {
            "title": "GAO-22-105111, Carbon Capture and Storage",
            "url": "https://www.gao.gov/assets/gao-22-105111.pdf",
            "date": "2021-12-20"
          }
        ]
      }
    },
    {
      "id": "hydrogen-energy-california",
      "title": "Hydrogen Energy California carbon capture",
      "category": "Energy",
      "jurisdiction": "California / Federal",
      "classification": "Audit findings / cancelled before construction",
      "money": {
        "amount": 153428898,
        "unit": "USD",
        "basis": "Actual DOE project funding reported by GAO",
        "asOf": "GAO 2021 review",
        "display": "$153.43M"
      },
      "status": "Funding agreement terminated; construction did not begin.",
      "evidenceSummary": "GAO places the project among four unbuilt coal carbon-capture demonstrations where DOE bypassed funding controls and increased early-phase exposure.",
      "receiptGap": "Award totals and stage are documented; invoice-level acceptance and final recovery records are not assembled here.",
      "sources": [
        {
          "title": "GAO-22-105111, tables 1 and 3",
          "url": "https://www.gao.gov/assets/gao-22-105111.pdf",
          "date": "2021-12"
        },
        {
          "title": "DOE 2013 HECA audit",
          "url": "https://www.energy.gov/ig/articles/audit-report-oas-ra-13-22",
          "date": "Reviewed 2026-11-09"
        }
      ],
      "caution": "The amount is included in the report’s broader four-project aggregate. The findings concern management and cost controls, not a fraud conviction.",
      "evidenceGroup": "Delivery failures",
      "receiptRequests": [
        "Connect federal reimbursements and utility payments to invoices, work packages and accepted engineering milestones.",
        "Publish final termination costs, recovery amounts and the disposition or reuse of equipment and facilities.",
        "Separate taxpayer funding, ratepayer charges and private investment in a reconciled ledger."
      ],
      "proposedChange": "Connect covered contracts and changes to payments and independently accepted milestones. Publish exceptions, recovery progress and reusable assets, with protected information available to independent oversight.",
      "traceability": {
        "scope": "hydrogen-energy-california",
        "reviewedOn": "2026-11-08",
        "receipts": [],
        "qualifier": "This file currently links summary-level sources, with no itemized invoice-to-payment records registered against this amount. The pie measures this collection only. Actual DOE project funding reported by GAO."
      },
      "relatableMetric": {
        "value": "2.05×",
        "label": "the planned funding for the phase reached",
        "kind": "comparison",
        "explanation": "DOE actual versus planned definition-phase funding, through termination.",
        "formula": "153,428,898 / 75,000,000",
        "caution": "Phase-specific federal award comparison, not full plant budget or measured fraud.",
        "sources": [
          {
            "title": "GAO-22-105111, Carbon Capture and Storage",
            "url": "https://www.gao.gov/assets/gao-22-105111.pdf",
            "date": "2021-12-20"
          }
        ]
      }
    },
    {
      "id": "summit-texas-clean-energy",
      "title": "Summit Texas Clean Energy carbon capture",
      "category": "Energy",
      "jurisdiction": "Texas / Federal",
      "classification": "Audit findings / cancelled before construction",
      "money": {
        "amount": 117876707,
        "unit": "USD",
        "basis": "Actual DOE project funding reported by GAO",
        "asOf": "GAO 2021 review",
        "display": "$117.88M"
      },
      "status": "Funding agreement terminated; facility was not built.",
      "evidenceSummary": "GAO reports actual early-phase funding at roughly 786% of the $15 million initially planned for the phase reached.",
      "receiptGap": "The source establishes funding and failed construction delivery, but does not provide all paid claims and accepted design deliverables in a public reconciled ledger.",
      "sources": [
        {
          "title": "GAO-22-105111, table 3",
          "url": "https://www.gao.gov/assets/gao-22-105111.pdf",
          "date": "2021-12"
        },
        {
          "title": "DOE OIG special report, reimbursements through February 2016",
          "url": "https://www.energy.gov/sites/prod/files/2016/04/f30/OIG-SR-16-02.pdf",
          "date": "Reviewed 2026-11-09"
        }
      ],
      "caution": "The management failure does not establish that design costs were stolen. This project is already included in the broader four-project total.",
      "evidenceGroup": "Delivery failures",
      "receiptRequests": [
        "Connect federal reimbursements and utility payments to invoices, work packages and accepted engineering milestones.",
        "Publish final termination costs, recovery amounts and the disposition or reuse of equipment and facilities.",
        "Separate taxpayer funding, ratepayer charges and private investment in a reconciled ledger."
      ],
      "proposedChange": "Connect covered contracts and changes to payments and independently accepted milestones. Publish exceptions, recovery progress and reusable assets, with protected information available to independent oversight.",
      "traceability": {
        "scope": "summit-texas-clean-energy",
        "reviewedOn": "2026-11-08",
        "receipts": [],
        "qualifier": "This file currently links summary-level sources, with no itemized invoice-to-payment records registered against this amount. The pie measures this collection only. Actual DOE project funding reported by GAO."
      },
      "relatableMetric": {
        "value": "7.86×",
        "label": "the planned funding for the phase reached",
        "kind": "comparison",
        "explanation": "DOE actual versus planned definition-phase funding, through termination.",
        "formula": "117,876,707 / 15,001,312",
        "caution": "786% of plan means 686% over plan. Not full plant cost or measured fraud.",
        "sources": [
          {
            "title": "GAO-22-105111, Carbon Capture and Storage",
            "url": "https://www.gao.gov/assets/gao-22-105111.pdf",
            "date": "2021-12-20"
          }
        ]
      }
    },
    {
      "id": "air-force-ecss",
      "title": "Air Force Expeditionary Combat Support System",
      "category": "Government technology",
      "jurisdiction": "Federal",
      "classification": "Cancelled system / no usable capability",
      "money": {
        "amount": 1000000000,
        "unit": "USD",
        "basis": "Over $1 billion spent before 2012 cancellation; rounded lower threshold",
        "asOf": "2012",
        "display": "Over $1B"
      },
      "status": "Cancelled after eight years without fielding usable capability, according to the Senate investigation.",
      "evidenceSummary": "The Senate report documents a failed logistics modernization effort and continued reliance on legacy systems.",
      "receiptGap": "An investigation can explain failure without establishing a complete public ledger linking every vendor payment to tested software and asset reuse.",
      "sources": [
        {
          "title": "Senate Permanent Subcommittee investigation of ECSS",
          "url": "https://www.govinfo.gov/content/pkg/CPRT-113SPRT89869/pdf/CPRT-113SPRT89869.pdf",
          "date": "2014"
        },
        {
          "title": "GAO-11-53 DOD business system oversight",
          "url": "https://www.gao.gov/products/gao-11-53",
          "date": "2010-10-07"
        },
        {
          "title": "Senate Homeland Security and Governmental Affairs Committee, bipartisan ECSS investigation",
          "url": "https://www.hsgac.senate.gov/subcommittees/investigations/rep/permanent-subcommittee-on-investigations-releases-report-on-ecss-program/",
          "date": "2014-07-07"
        }
      ],
      "caution": "Cancellation and unusable delivery alone do not establish criminal fraud.",
      "evidenceGroup": "Delivery failures",
      "receiptRequests": [
        "Link each contract change and payment to tested software, accepted functionality and deployment milestones.",
        "Publish independent acceptance-test results, unresolved defects and service impacts, with sensitive details protected.",
        "Reconcile termination costs, recoveries and reused software or equipment."
      ],
      "proposedChange": "Connect covered contracts and changes to payments and independently accepted milestones. Publish exceptions, recovery progress and reusable assets, with protected information available to independent oversight.",
      "traceability": {
        "scope": "air-force-ecss",
        "reviewedOn": "2026-11-08",
        "receipts": [],
        "qualifier": "This file currently links summary-level sources, with no itemized invoice-to-payment records registered against this amount. The pie measures this collection only. Over $1 billion spent before 2012 cancellation; rounded lower threshold. Preserve the source qualifier: this is not an exact spending denominator."
      },
      "relatableMetric": {
        "value": ">$125M/year",
        "label": "average over eight years without usable capability",
        "kind": "comparison",
        "explanation": "Senate investigation: more than $1B over eight years, 2004–2012.",
        "formula": "more than 1,000,000,000 / 8 years",
        "caution": "This is a simple annual average, not the expenditure in every year. No usable capability does not establish zero salvage value.",
        "sources": [
          {
            "title": "Senate Homeland Security and Governmental Affairs Committee, bipartisan ECSS investigation",
            "url": "https://www.hsgac.senate.gov/subcommittees/investigations/rep/permanent-subcommittee-on-investigations-releases-report-on-ecss-program/",
            "date": "2014-07-07"
          }
        ]
      }
    },
    {
      "id": "fbi-virtual-case-file",
      "title": "FBI Virtual Case File",
      "category": "Government technology",
      "jurisdiction": "Federal",
      "classification": "Cancelled system / delivery failure",
      "money": {
        "amount": 104500000,
        "unit": "USD",
        "basis": "FBI-reported amount lost within the $170 million project; DOJ OIG did not verify this breakdown",
        "asOf": "2006 DOJ OIG report",
        "display": "$104.5M"
      },
      "status": "Discontinued in 2005; later replaced by the separate Sentinel program.",
      "evidenceSummary": "DOJ OIG records the FBI’s reported breakdown: $104.5 million lost, $53.3 million of usable contractor services/equipment, and $12.2 million unspent. OIG expressly says it did not verify those figures.",
      "receiptGap": "This source distinguishes loss, reusable work and unspent budget. Publicly linking each claim to accepted functionality and reuse remains a separate task.",
      "sources": [
        {
          "title": "DOJ OIG Audit Report 07-03",
          "url": "https://oig.justice.gov/archives/reports/FBI/a0703/final.pdf",
          "date": "2006"
        },
        {
          "title": "DOJ OIG Trilogy and Virtual Case File review",
          "url": "https://oig.justice.gov/archives/reports/FBI/a0703/intro.htm",
          "date": "Reviewed 2026-11-09"
        }
      ],
      "caution": "This is a reported disposition, not an independently established value of the delivered software. The $170 million also includes usable work and unspent funds; Sentinel was a separate successor program.",
      "evidenceGroup": "Delivery failures",
      "receiptRequests": [
        "Link each contract change and payment to tested software, accepted functionality and deployment milestones.",
        "Publish independent acceptance-test results, unresolved defects and service impacts, with sensitive details protected.",
        "Reconcile termination costs, recoveries and reused software or equipment."
      ],
      "proposedChange": "Connect covered contracts and changes to payments and independently accepted milestones. Publish exceptions, recovery progress and reusable assets, with protected information available to independent oversight.",
      "traceability": {
        "scope": "fbi-virtual-case-file",
        "reviewedOn": "2026-11-08",
        "receipts": [],
        "qualifier": "This file currently links summary-level sources, with no itemized invoice-to-payment records registered against this amount. The pie measures this collection only. Amount FBI said was lost within the $170 million project; not the full project budget."
      },
      "relatableMetric": {
        "value": "61.5%",
        "label": "of the project envelope reported lost by FBI",
        "kind": "comparison",
        "explanation": "FBI breakdown: $104.5M lost, $53.3M reusable services/equipment, $12.2M unspent.",
        "formula": "104,500,000 / 170,000,000 × 100",
        "caution": "DOJ OIG explicitly did not verify these FBI figures. The $170M includes unspent funding; do not call it all paid out.",
        "sources": [
          {
            "title": "DOJ OIG, Sentinel audit A-2007-003",
            "url": "https://oig.justice.gov/archives/reports/FBI/a0703/final.pdf",
            "date": "2006-12"
          }
        ]
      }
    },
    {
      "id": "sbinet",
      "title": "SBInet virtual border system",
      "category": "Government technology",
      "jurisdiction": "Federal / Southwest border",
      "classification": "Cancelled system / delivery shortfall",
      "money": {
        "amount": 1000000000,
        "unit": "USD",
        "basis": "More than $1 billion obligated, not a verified disbursement or loss total",
        "asOf": "2011-01",
        "display": "Over $1B"
      },
      "status": "Original SBInet program ended in January 2011 after failing cost-effectiveness and viability standards.",
      "evidenceSummary": "GAO recounts cancellation after obligations exceeded $1 billion; previous oversight identified serious requirements and testing risks.",
      "receiptGap": "Obligations commit funding; they are not paid receipts. Disbursements, delivered equipment, reusable capability and closeout recoveries require separate reconciliation.",
      "sources": [
        {
          "title": "GAO-13-796T IT initiatives testimony",
          "url": "https://www.gao.gov/assets/gao-13-796t.pdf",
          "date": "2013"
        },
        {
          "title": "GAO-08-1086 SBInet technology risks",
          "url": "https://www.gao.gov/products/gao-08-1086",
          "date": "2008"
        },
        {
          "title": "GAO-12-22, Arizona Border Surveillance Technology",
          "url": "https://www.gao.gov/products/gao-12-22",
          "date": "2011-11-04"
        },
        {
          "title": "GAO-10-877R, table 6, funds expended through March 31, 2010",
          "url": "https://www.gao.gov/assets/a96976.html",
          "date": "Reviewed 2026-11-09"
        },
        {
          "title": "GAO-10-340, September 2006 Boeing contract",
          "url": "https://www.gao.gov/assets/a304041.html",
          "date": "Reviewed 2026-11-09"
        }
      ],
      "caution": "An obligation commits funding; it does not establish that the entire amount was paid, lost, or fraudulent.",
      "evidenceGroup": "Delivery failures",
      "receiptRequests": [
        "Link each contract change and payment to tested software, accepted functionality and deployment milestones.",
        "Publish independent acceptance-test results, unresolved defects and service impacts, with sensitive details protected.",
        "Reconcile termination costs, recoveries and reused software or equipment."
      ],
      "proposedChange": "Connect covered contracts and changes to payments and independently accepted milestones. Publish exceptions, recovery progress and reusable assets, with protected information available to independent oversight.",
      "traceability": {
        "scope": "sbinet",
        "reviewedOn": "2026-11-08",
        "receipts": [],
        "qualifier": "This file currently links summary-level sources, with no itemized invoice-to-payment records registered against this amount. The pie measures this collection only. More than $1 billion obligated, not a verified disbursement or loss total. Preserve the source qualifier: this is not an exact spending denominator."
      },
      "relatableMetric": {
        "value": "53 miles",
        "label": "of border deployment before cancellation",
        "kind": "reported outcome",
        "explanation": "GAO’s November 2011 account of the canceled SBInet effort in Arizona.",
        "formula": "53 miles of deployment following nearly $1B spent",
        "caution": "Whole-program spending divided by deployed miles would not be a construction cost per mile. Do not substitute a later obligation figure for this spending snapshot.",
        "sources": [
          {
            "title": "GAO-12-22, Arizona Border Surveillance Technology",
            "url": "https://www.gao.gov/products/gao-12-22",
            "date": "2011-11-04"
          }
        ]
      }
    },
    {
      "id": "va-ehr-modernization",
      "title": "VA electronic health record modernization",
      "category": "Government technology",
      "jurisdiction": "Federal",
      "classification": "Audit findings / delayed rollout",
      "money": {
        "amount": 10500000000,
        "unit": "USD",
        "basis": "2018–2024 obligated actual spending as described in VA's FY2027 budget; not the total future program cost",
        "asOf": "2024",
        "display": "$10.5B"
      },
      "status": "Continuing modernization with a limited rollout and revised cost forecasts; not a never-delivered system.",
      "evidenceSummary": "GAO found incremental improvements but a need for updated estimates and schedules. VA's April 2026 budget describes a roughly $37.2 billion forecast including $10.5 billion of 2018–2024 obligated actual spending.",
      "receiptGap": "Forecast cost, obligations, invoice payments, adoption and patient-safety performance measure different things. This collection has no complete invoice-to-clinical-outcome reconciliation.",
      "sources": [
        {
          "title": "VA FY2027 budget, Volume 5",
          "url": "https://department.va.gov/wp-content/uploads/2026/04/Volume-5.pdf",
          "date": "2026-04"
        },
        {
          "title": "GAO-25-106874 EHR modernization",
          "url": "https://files.gao.gov/reports/GAO-25-106874/index.html",
          "date": "2025"
        },
        {
          "title": "VA announces signed Cerner contract",
          "url": "https://news.va.gov/press-room/statement-by-acting-secretary-robert-wilkie-va-signs-contract-with-cerner-for-an-electronic-health-record-system/",
          "date": "Reviewed 2026-11-09"
        },
        {
          "title": "GAO review of cost and schedule gaps",
          "url": "https://www.gao.gov/products/gao-25-106874",
          "date": "Reviewed 2026-11-09"
        },
        {
          "title": "Budget Appendix, FY2019 actual gross outlays, account 036-1123",
          "url": "https://www.govinfo.gov/content/pkg/BUDGET-2021-APP/html/BUDGET-2021-APP-1-20.htm",
          "date": "Reviewed 2026-11-09"
        },
        {
          "title": "Budget Appendix, FY2020 actual gross outlays, account 036-1123",
          "url": "https://www.govinfo.gov/content/pkg/BUDGET-2022-APP/pdf/BUDGET-2022-APP-1-19.pdf",
          "date": "Reviewed 2026-11-09"
        },
        {
          "title": "Budget Appendix, FY2021 actual gross outlays, account 036-1123",
          "url": "https://www.govinfo.gov/content/pkg/BUDGET-2023-APP/pdf/BUDGET-2023-APP-1-19.pdf",
          "date": "Reviewed 2026-11-09"
        },
        {
          "title": "Budget Appendix, FY2022 actual gross outlays, account 036-1123",
          "url": "https://www.govinfo.gov/content/pkg/BUDGET-2024-APP/pdf/BUDGET-2024-APP-1-19.pdf",
          "date": "Reviewed 2026-11-09"
        },
        {
          "title": "Budget Appendix, FY2023 actual gross outlays, account 036-1123",
          "url": "https://www.govinfo.gov/content/pkg/BUDGET-2025-APP/pdf/BUDGET-2025-APP-1-19.pdf",
          "date": "Reviewed 2026-11-09"
        },
        {
          "title": "Budget Appendix, FY2024 actual gross outlays, account 036-1123",
          "url": "https://www.govinfo.gov/content/pkg/BUDGET-2026-APP/pdf/BUDGET-2026-APP-2-19.pdf",
          "date": "Reviewed 2026-11-09"
        },
        {
          "title": "Budget Appendix, FY2025 actual gross outlays, account 036-1123",
          "url": "https://www.govinfo.gov/content/pkg/BUDGET-2027-APP/pdf/BUDGET-2027-APP-2-18.pdf",
          "date": "Reviewed 2026-11-09"
        }
      ],
      "caution": "The earlier $16.1 billion and independent $49.8 billion estimates have different scopes. They are not additional amounts to add to the $37.2 billion forecast or $10.5 billion obligated figure.",
      "evidenceGroup": "Audit and oversight findings",
      "receiptRequests": [
        "Link each contract change and payment to tested software, accepted functionality and deployment milestones.",
        "Publish independent acceptance-test results, unresolved defects and service impacts, with sensitive details protected.",
        "Reconcile termination costs, recoveries and reused software or equipment."
      ],
      "proposedChange": "Connect covered contracts and changes to payments and independently accepted milestones. Publish exceptions, recovery progress and reusable assets, with protected information available to independent oversight.",
      "traceability": {
        "scope": "va-ehr-modernization",
        "reviewedOn": "2026-11-08",
        "receipts": [],
        "qualifier": "This file currently links summary-level sources, with no itemized invoice-to-payment records registered against this amount. The pie measures this collection only. 2018–2024 obligated actual spending as described in VA's FY2027 budget; not the total future program cost."
      },
      "relatableMetric": {
        "value": "$1.5B/year",
        "label": "average obligated amount, 2018–2024",
        "kind": "comparison",
        "explanation": "The VA FY2027 budget reports $10.5 billion of obligated actual spending across seven calendar years, 2018–2024.",
        "formula": "$10.5 billion ÷ 7 calendar years",
        "caution": "Annual average of the source’s obligated amount, not cash paid in every year or cost per patient. The larger lifecycle forecast has a different scope.",
        "sources": [
          {
            "title": "VA FY2027 Budget Submission, Volume 5",
            "url": "https://department.va.gov/wp-content/uploads/2026/04/Volume-5.pdf#page=159",
            "date": "2026-04"
          }
        ]
      }
    },
    {
      "id": "future-combat-systems",
      "title": "Army Future Combat Systems",
      "category": "Defense procurement",
      "jurisdiction": "Federal",
      "classification": "Cancelled program / limited delivered capability",
      "money": {
        "amount": 21000000000,
        "unit": "USD",
        "basis": "Cost reported in GAO's 2019 retrospective; scope differs from earlier $18.1 billion figure",
        "asOf": "GAO 2019 retrospective",
        "display": "$21B"
      },
      "status": "Cancelled through phased terminations beginning in 2009; some assets and technology were transferred or continued.",
      "evidenceSummary": "GAO describes $21 billion in cost and few new capabilities. Its cancellation review lists two new production programs and transferred software; the value of reused assets needs separate accounting.",
      "receiptGap": "Residual value and technology transfer mean expenditure cannot simply equal loss. Reusable assets need valuation and traceable disposition records.",
      "sources": [
        {
          "title": "GAO-19-132 Army modernization",
          "url": "https://www.gao.gov/products/gao-19-132",
          "date": "2019-01-23"
        },
        {
          "title": "GAO-14-77 canceled DOD programs and reusable assets",
          "url": "https://www.gao.gov/assets/gao-14-77.pdf",
          "date": "2014"
        },
        {
          "title": "GAO FCS funding profile and estimates",
          "url": "https://www.gao.gov/assets/a273426.html",
          "date": "Reviewed 2026-11-09"
        },
        {
          "title": "GAO FCS contract and fee review",
          "url": "https://www.gao.gov/assets/a261687.html",
          "date": "Reviewed 2026-11-09"
        }
      ],
      "caution": "The earlier $18.1 billion cost figure and planned $159 billion procurement estimate are different measures, not additional losses.",
      "evidenceGroup": "Delivery failures",
      "receiptRequests": [
        "Connect the contract, work order, invoice and approval to delivered equipment or service.",
        "Publish permitted acceptance and performance evidence; give independent auditors access to protected details.",
        "Reconcile recovery orders, amounts collected, termination costs and reusable assets."
      ],
      "proposedChange": "Connect covered contracts and changes to payments and independently accepted milestones. Publish exceptions, recovery progress and reusable assets, with protected information available to independent oversight.",
      "traceability": {
        "scope": "future-combat-systems",
        "reviewedOn": "2026-11-08",
        "receipts": [],
        "qualifier": "This file currently links summary-level sources, with no itemized invoice-to-payment records registered against this amount. The pie measures this collection only. Cost reported in GAO's 2019 retrospective; scope differs from earlier $18.1 billion figure."
      },
      "relatableMetric": {
        "value": "$21 billion",
        "label": "before cancellation, with few new capabilities",
        "kind": "reported outcome",
        "explanation": "GAO’s 2019 retrospective describes cost and limited capability delivery.",
        "formula": "GAO-reported program cost; no unsupported cost-per-system calculation",
        "caution": "Do not use “one of 18 completed”: GAO separately lists two new production programs and transferred software, with incomplete asset accounting.",
        "sources": [
          {
            "title": "GAO-19-132, Army Modernization",
            "url": "https://www.gao.gov/products/gao-19-132",
            "date": "2019-01-23"
          },
          {
            "title": "GAO-14-77, Canceled DOD Programs",
            "url": "https://www.gao.gov/assets/gao-14-77.pdf#page=25",
            "date": "2014-03-27"
          }
        ]
      }
    },
    {
      "id": "gps-ocx",
      "title": "GPS Next Generation Operational Control System (OCX)",
      "category": "Defense procurement",
      "jurisdiction": "Federal",
      "classification": "Cancelled system / delivery failure",
      "money": {
        "amount": 6270000000,
        "unit": "USD",
        "basis": "Approximate program cost including Raytheon funding to date and government testing/support, as stated by Space Force",
        "asOf": "2026-01",
        "display": "$6.27B"
      },
      "status": "Cancelled April 17, 2026 after integrated testing found major issues; existing GPS ground control is being upgraded instead.",
      "evidenceSummary": "Space Force said OCX could not deliver needed capabilities on an operationally relevant timeline at acceptable risk, despite contractual acceptance of the system in July 2025.",
      "receiptGap": "Contractual acceptance did not demonstrate integrated operational delivery. Final termination liability, settlement, reusable software and asset disposition are not reconciled in the press release.",
      "sources": [
        {
          "title": "Space Force announces OCX termination",
          "url": "https://www.af.mil/News/Commentaries/Article/4465024/ussf-terminates-program-for-the-global-positioning-system-next-generation-opera/",
          "date": "2026-04-20"
        },
        {
          "title": "GAO-27-107676 Precision navigation systems",
          "url": "https://files.gao.gov/reports/GAO-27-107676/index.html",
          "date": "2026-10"
        },
        {
          "title": "DoD GPS OCX December 2012 acquisition report",
          "url": "https://www.esd.whs.mil/Portals/54/Documents/FOID/Reading%20Room/Selected_Acquisition_Reports/FY_2012_SARS/GPS_OCX_December_2012_SAR.pdf",
          "date": "Reviewed 2026-11-09"
        },
        {
          "title": "DoD December 2019 SAR, expenditure table, page 43",
          "url": "https://www.esd.whs.mil/Portals/54/Documents/FOID/Reading%20Room/Selected_Acquisition_Reports/FY_2019_SARS/20-F-0568_DOC_66_OCX_SAR_Dec_2019_Full.pdf",
          "date": "Reviewed 2026-11-09"
        },
        {
          "title": "GAO 2017 weapon-program assessment, GPS OCX",
          "url": "https://www.gao.gov/products/gao-17-333sp",
          "date": "Reviewed 2026-11-09"
        }
      ],
      "caution": "This is a January 2026 program-cost snapshot, not the final terminated-program loss; later figures may include different dates and scope.",
      "evidenceGroup": "Delivery failures",
      "receiptRequests": [
        "Connect the contract, work order, invoice and approval to delivered equipment or service.",
        "Publish permitted acceptance and performance evidence; give independent auditors access to protected details.",
        "Reconcile recovery orders, amounts collected, termination costs and reusable assets."
      ],
      "proposedChange": "Connect covered contracts and changes to payments and independently accepted milestones. Publish exceptions, recovery progress and reusable assets, with protected information available to independent oversight.",
      "traceability": {
        "scope": "gps-ocx",
        "reviewedOn": "2026-11-08",
        "receipts": [],
        "qualifier": "This file currently links summary-level sources, with no itemized invoice-to-payment records registered against this amount. The pie measures this collection only. Approximate program cost including Raytheon funding to date and government testing/support, as stated by Space Force."
      },
      "relatableMetric": {
        "value": "<1 year",
        "label": "from contractual acceptance to cancellation",
        "kind": "reported outcome",
        "explanation": "Air Force reports $6.27B program cost as of January 2026.",
        "formula": "July 2025 contractual acceptance → April 17, 2026 cancellation",
        "caution": "Contractual acceptance did not demonstrate successful integration or operational readiness. Do not equate cancellation with a $6.27B fraud finding.",
        "sources": [
          {
            "title": "U.S. Air Force, USSF terminates GPS Next Generation Operational Control System program",
            "url": "https://www.af.mil/News/Commentaries/Article/4465024/ussf-terminates-program-for-the-global-positioning-system-next-generation-opera/",
            "date": "2026-04-20"
          }
        ]
      }
    },
    {
      "id": "pandemic-sba-ppp-eidl",
      "title": "Pandemic small-business loans: PPP and COVID EIDL",
      "category": "Pandemic relief",
      "jurisdiction": "United States",
      "classification": "Estimated potential fraud",
      "money": {
        "amount": 200000000000,
        "unit": "USD",
        "display": "Over $200 billion",
        "basis": "SBA Inspector General estimate of potentially fraudulent disbursements; not a court-established loss",
        "asOf": "2023-06-27"
      },
      "status": "SBA OIG published a program-wide estimate; investigations and recoveries are separate from the estimate.",
      "evidenceSummary": "SBA OIG estimated over $200 billion in potentially fraudulent PPP and COVID EIDL disbursements. GAO records SBA's competing estimate of around $36 billion in likely fraud. The agencies used different assessments; neither figure is a set of final court judgments.",
      "receiptGap": "GAO reported in March 2025 that about 2 million of almost 3 million COVID EIDL referrals to SBA OIG were not actionable because of missing data or quality problems. This is a referral-quality finding, not a percentage of missing financial receipts. A loan-to-payment-to-outcome reconciliation is not assembled here.",
      "sources": [
        {
          "title": "SBA OIG Report 23-09: COVID-19 Pandemic EIDL and PPP Loan Fraud Landscape",
          "url": "https://legacy.sba.gov/document/report-23-09-covid-19-pandemic-eidl-ppp-loan-fraud-landscape",
          "date": "2023-06-27"
        },
        {
          "title": "GAO: Improved Controls Needed for Referring Likely Fraud in SBA's Pandemic Loan Programs",
          "url": "https://files.gao.gov/reports/GAO-25-107267/index.html",
          "date": "2025-03-24"
        }
      ],
      "caution": "Potential-fraud flags do not establish guilt for every borrower. SBA disputed aspects of the OIG estimate. Program estimates overlap the individual cases within them.",
      "receiptRequests": [
        "Publish a privacy-protected loan-level reconciliation of approval, disbursement, forgiveness, ineligibility determination, appeal and recovery amounts.",
        "Publish the required data fields, rejection reasons and remediation status for non-actionable OIG referrals.",
        "Give independent auditors secure access to supporting identity and business records; publish aggregate validation results and sampling methods."
      ],
      "proposedChange": "Require traceable loan decisions and usable fraud referrals, with notice, correction and appeal routes so legitimate small businesses are not penalized for unresolved flags.",
      "evidenceGroup": "Estimated exposure",
      "traceability": {
        "scope": "pandemic-sba-ppp-eidl",
        "reviewedOn": "2026-11-08",
        "receipts": [],
        "qualifier": "This file currently links summary-level sources, with no itemized invoice-to-payment records registered against this amount. The pie measures this collection only. SBA Inspector General estimate of potentially fraudulent disbursements; not a court-established loss. Preserve the source qualifier: this is not an exact spending denominator."
      },
      "relatableMetric": {
        "value": "≥17%",
        "label": "of disbursements flagged as potential fraud by OIG",
        "kind": "same scope rate",
        "explanation": "A dollar-in-dollar comparison is clearer than a standalone $200B figure.",
        "caution": "Potential fraud estimate, not adjudicated loss. SBA disputed the OIG methodology and produced a much lower estimate; display that disagreement with the figure.",
        "sources": [
          {
            "title": "SBA OIG report 23-09: COVID-19 Pandemic EIDL and PPP Loan Fraud Landscape",
            "url": "https://legacy.sba.gov/document/report-23-09-covid-19-pandemic-eidl-ppp-loan-fraud-landscape",
            "date": "2023-06-27"
          },
          {
            "title": "GAO-25-107267: COVID-19 Relief",
            "url": "https://files.gao.gov/reports/GAO-25-107267/index.html",
            "date": "2025-03-24"
          }
        ],
        "formula": "Use SBA OIG's published 'at least 17 percent' estimate rather than recomputing rounded headline totals."
      }
    },
    {
      "id": "pandemic-unemployment",
      "title": "Pandemic unemployment insurance fraud",
      "category": "Pandemic relief",
      "jurisdiction": "United States / 53 participating jurisdictions",
      "classification": "Statistical fraud estimate",
      "money": {
        "amount": 100000000000,
        "upperAmount": 135000000000,
        "unit": "USD",
        "display": "$100–135 billion",
        "basis": "GAO estimate of fraud, April 2020–May 2023",
        "asOf": "2023-09-12"
      },
      "status": "GAO estimated fraud at 11–15% of pandemic unemployment benefits; the full amount will likely never be known with certainty.",
      "evidenceSummary": "GAO used statistical sampling and imputation to estimate $100–135 billion in fraud across regular and temporary unemployment programs. DOL disputed the methodology; GAO defended its estimate. This is distinct from states' identified overpayments and recoveries.",
      "receiptGap": "The linked aggregate audit does not provide a public, claimant-level crosswalk from verified eligibility to payments, fraud findings, appeals and recoveries. Privacy-protected independent audit access would be needed to reconcile that chain.",
      "sources": [
        {
          "title": "GAO-23-106696: Estimated Amount of Fraud During Pandemic Likely Between $100 Billion and $135 Billion",
          "url": "https://www.gao.gov/products/gao-23-106696",
          "date": "2023-09-12"
        }
      ],
      "caution": "A statistical estimate is not a list of convictions. Improper payments and individual recipients’ criminal liability are separate questions.",
      "receiptRequests": [
        "Publish state-level reconciliations of benefits paid, identified fraud, non-fraud overpayments, waivers, appeals and recoveries.",
        "Provide auditors protected access to claimant eligibility and identity checks linked to each payment.",
        "Publish fraud-estimation methods and confidence ranges separately from adjudicated case totals."
      ],
      "proposedChange": "Fund rapid verification and correction processes while preserving timely benefits and due process for eligible workers.",
      "evidenceGroup": "Estimated exposure",
      "traceability": {
        "scope": "pandemic-unemployment",
        "reviewedOn": "2026-11-08",
        "receipts": [],
        "qualifier": "This file currently links summary-level sources, with no itemized invoice-to-payment records registered against this amount. The pie measures this collection only. GAO estimate of fraud, April 2020–May 2023. The reported figure is a range; zero matched dollars is 0% throughout that range."
      },
      "relatableMetric": {
        "value": "11%–15%",
        "label": "of benefits estimated fraudulent by GAO",
        "kind": "same scope rate",
        "explanation": "GAO estimated fraud in unemployment insurance benefits",
        "caution": "Statistical fraud estimate, not individual adjudications. Labor disputed aspects of GAO's methodology. Distinguish this estimate from improper-payment totals.",
        "sources": [
          {
            "title": "GAO-23-106696: Unemployment Insurance",
            "url": "https://www.gao.gov/products/gao-23-106696",
            "date": "2023-09-12"
          }
        ],
        "formula": "Use GAO's published 11%–15% estimate."
      }
    },
    {
      "id": "feeding-our-future",
      "title": "Feeding Our Future child-meal fraud",
      "category": "Food assistance",
      "jurisdiction": "Minnesota / federal child nutrition funds",
      "classification": "Criminal conviction / sentencing",
      "money": {
        "amount": 250000000,
        "unit": "USD",
        "display": "$250 million scheme",
        "basis": "DOJ's description of scheme size; release separately says over $240 million fraudulently obtained and disbursed",
        "asOf": "2026-05-22"
      },
      "status": "DOJ reported Aimee Bock sentenced to 500 months after conviction; other defendants' statuses must be assessed individually.",
      "evidenceSummary": "DOJ said trial evidence established false meal counts and attendance rosters, shell companies and kickbacks. Its May 2026 sentencing release describes a $250 million scheme and over $240 million fraudulently obtained and disbursed.",
      "receiptGap": "The linked sentencing summary is not the complete meal-site ledger, attendance evidence, reimbursement trail or current recovery accounting. This record does not calculate what share of claimed meals was independently verified.",
      "sources": [
        {
          "title": "DOJ: Feeding Our Future Ringleader Sentenced to 500 Months",
          "url": "https://www.justice.gov/usao-mn/pr/feeding-our-future-ringleader-sentenced-500-months",
          "date": "2026-05-22"
        },
        {
          "title": "DOJ: Federal Jury Finds Feeding Our Future Mastermind and Co-Defendant Guilty",
          "url": "https://www.justice.gov/usao-mn/pr/federal-jury-finds-feeding-our-future-mastermind-and-co-defendant-guilty-250-million",
          "date": "2025-03-19"
        }
      ],
      "caution": "This finding concerns the proven scheme; it does not establish wrongdoing by every nutrition-program participant. Scheme totals already contain component transactions.",
      "receiptRequests": [
        "Link each meal-site reimbursement to dated meal counts, attendance support, supplier invoices and sponsor approval.",
        "Publish independent site-verification findings, exceptions and corrective-action status without exposing children’s identities.",
        "Publish a non-duplicative restitution, forfeiture and recovery ledger tied to final judgments."
      ],
      "proposedChange": "Require independent checks on claimed service volumes and conflicts of interest while routing funds to verified meal providers so children keep receiving meals.",
      "evidenceGroup": "Proven misconduct",
      "traceability": {
        "scope": "feeding-our-future",
        "reviewedOn": "2026-11-08",
        "receipts": [],
        "qualifier": "This file currently links summary-level sources, with no itemized invoice-to-payment records registered against this amount. The pie measures this collection only. DOJ's description of scheme size; release separately says over $240 million fraudulently obtained and disbursed."
      },
      "relatableMetric": {
        "value": "~59×",
        "label": "growth in annual federal funding in two years",
        "kind": "historical growth",
        "explanation": "Federal child-nutrition funds disbursed to Feeding Our Future grew from $3.4 million in 2019 to nearly $200 million in 2021.",
        "caution": "Rounded funding comparison; growth itself does not establish fraud. The related trial and convictions establish the scheme separately.",
        "sources": [
          {
            "title": "DOJ: Federal Jury Finds Feeding Our Future Mastermind and Co-Defendant Guilty",
            "url": "https://www.justice.gov/usao-mn/pr/federal-jury-finds-feeding-our-future-mastermind-and-co-defendant-guilty-250-million",
            "date": "2025-03-19"
          }
        ],
        "formula": "Nearly $200 million (2021) ÷ $3.4 million (2019) ≈ 59"
      }
    },
    {
      "id": "mississippi-tanf",
      "title": "Mississippi welfare spending scandal",
      "category": "Welfare / grants",
      "jurisdiction": "Mississippi / federal TANF and other assistance",
      "classification": "Audit findings and criminal guilty plea",
      "money": {
        "amount": 77000000,
        "unit": "USD",
        "display": "Over $77 million",
        "basis": "State Auditor's identified misspent TANF funds underlying civil repayment demands; not a universal criminal fraud judgment",
        "asOf": "2021-10-12"
      },
      "status": "State Auditor issued civil demands in 2021; former DHS director John Davis pleaded guilty to federal fraud-related conspiracy charges in 2022.",
      "evidenceSummary": "The Mississippi State Auditor identified over $77 million in illegal TANF spending. Separately, DOJ reported John Davis admitted a conspiracy involving misuse of TANF and TEFAP funds. The audit totals and individual criminal liability are different questions.",
      "receiptGap": "A complete grant-to-subgrant-to-vendor chain, actual deliverables and current recovery reconciliation are not assembled in this record. Civil demand amounts include overlapping joint liability and sometimes interest.",
      "sources": [
        {
          "title": "Mississippi State Auditor: Auditor Demands Repayment of Misspent Welfare Money",
          "url": "https://www.osa.ms.gov/news/auditor-demands-repayment-misspent-welfare-money",
          "date": "2021-10-12"
        },
        {
          "title": "DOJ: Former Executive Director of Mississippi DHS Pleads Guilty",
          "url": "https://www.justice.gov/archives/opa/pr/former-executive-director-mississippi-department-human-services-pleads-guilty-conspiring",
          "date": "2022-09-22"
        },
        {
          "title": "Mississippi DHS audit findings",
          "url": "https://www.osa.ms.gov/news/audit-dhs-reveals-millions-wasted",
          "date": "Reviewed 2026-11-09"
        },
        {
          "title": "MDHS forensic findings, payment tables and check dates",
          "url": "https://www.mdhs.ms.gov/document/tanf-forensic-findings/",
          "date": "Reviewed 2026-11-09"
        }
      ],
      "caution": "The Auditor states that civil demands do not imply criminal liability. Some demands overlap through joint liability; individual defendants’ legal outcomes differ.",
      "receiptRequests": [
        "Publish the grant-to-subgrant-to-vendor payment chain, contracts and itemized accepted deliverables.",
        "Reconcile every repayment demand with interest, joint liability, court outcome and actual collections.",
        "Publish eligibility-purpose determinations and independent evidence that contracted services reached intended beneficiaries."
      ],
      "proposedChange": "Require grants to demonstrate eligible services and independent acceptance, with correction and recovery focused on misused payments rather than cutting assistance to eligible families.",
      "evidenceGroup": "Proven misconduct",
      "traceability": {
        "scope": "mississippi-tanf",
        "reviewedOn": "2026-11-08",
        "receipts": [],
        "qualifier": "This file currently links summary-level sources, with no itemized invoice-to-payment records registered against this amount. The pie measures this collection only. State Auditor's identified misspent TANF funds underlying civil repayment demands; not a universal criminal fraud judgment. Preserve the source qualifier: this is not an exact spending denominator."
      },
      "relatableMetric": {
        "value": "2 nonprofits / $77M+",
        "label": "linked through two nonprofit conduits",
        "kind": "scope context",
        "explanation": "TANF money the state auditor said was misspent or improperly dispersed",
        "caution": "Do not divide into an average or imply equal responsibility. Civil demands can overlap through joint liability and include interest. Not every disputed dollar has the same criminal disposition.",
        "sources": [
          {
            "title": "Mississippi State Auditor: Auditor Demands Repayment of Misspent Welfare Money",
            "url": "https://www.osa.ms.gov/news/auditor-demands-repayment-misspent-welfare-money",
            "date": "2021-10-12"
          }
        ]
      }
    },
    {
      "id": "nyc-citytime",
      "title": "New York City CityTime payroll project",
      "category": "Government IT / procurement",
      "jurisdiction": "New York City",
      "classification": "Criminal convictions / restitution",
      "money": {
        "amount": 620000000,
        "unit": "USD",
        "display": "Over $620 million project cost",
        "basis": "Project cost by December 2010, partly driven by fraud; not the amount wholly stolen",
        "asOf": "2014-04-28"
      },
      "status": "Three scheme leaders were sentenced in 2014. DOJ reported over $466 million restitution paid to the city and $40 million in debt canceled.",
      "evidenceSummary": "CityTime's prime contract was about $73 million in 2000; project costs reached over $620 million by the arrests. DOJ established kickbacks, inflated labor rates, overstaffing and false timesheets. Its release reports substantial recoveries.",
      "receiptGap": "The linked prosecution summary does not reconcile every contract amendment, approved hour, invoice, delivered system feature and recovery. A reader cannot derive a project-wide verified-deliverable percentage from it.",
      "sources": [
        {
          "title": "DOJ: Three Leaders of CityTime Fraud Scheme Sentenced to 20 Years",
          "url": "https://www.justice.gov/usao-sdny/pr/three-leaders-citytime-fraud-scheme-each-sentenced-manhattan-federal-court-20-years",
          "date": "2014-04-28"
        },
        {
          "title": "DOJ CityTime recovery and amount paid to SAIC",
          "url": "https://www.justice.gov/archive/usao/nys/pressreleases/May12/citytimesaicforfeiture.html",
          "date": "Reviewed 2026-11-09"
        },
        {
          "title": "SAIC deferred-prosecution agreement",
          "url": "https://www.justice.gov/sites/default/files/usao-sdny/legacy/2012/04/18/saicdeferredprosecutionagreementinformationandstatementofresponsibility.pdf",
          "date": "Reviewed 2026-11-09"
        },
        {
          "title": "Checkbook NYC contract and dated payment search",
          "url": "https://www.checkbooknyc.com/smart_search/citywide?search_term=CT113120040003544",
          "date": "Reviewed 2026-11-09"
        },
        {
          "title": "Archived Checkbook export, all 115 original rows",
          "url": "https://www.impactline.org/data/citytime-checkbook-export.csv",
          "date": "Reviewed 2026-11-09"
        },
        {
          "title": "Comptroller CityTime oversight audit",
          "url": "https://comptroller.nyc.gov/reports/audit-report-on-the-office-of-payroll-administrations-monitoring-of-the-oversight-of-the-citytime-project-by-spherion-atlantic-enterprises-llc/",
          "date": "Reviewed 2026-11-09"
        }
      ],
      "caution": "Project cost, proven fraud loss, restitution, forfeiture and canceled debt are different measures that may overlap.",
      "receiptRequests": [
        "Link contract amendments, rate schedules and invoices to approved timesheets and accepted software milestones.",
        "Publish subcontractor ownership, conflicts disclosures and sole-source justifications.",
        "Reconcile restitution, forfeiture and canceled debt without double counting."
      ],
      "proposedChange": "Require independent milestone testing and invoice review, with transparent change orders and protected whistleblowing while maintaining essential payroll operations.",
      "evidenceGroup": "Proven misconduct",
      "traceability": {
        "scope": "nyc-citytime",
        "reviewedOn": "2026-11-08",
        "receipts": [],
        "qualifier": "This file currently links summary-level sources, with no itemized invoice-to-payment records registered against this amount. The pie measures this collection only. Project cost by December 2010, partly driven by fraud; not the amount wholly stolen. Preserve the source qualifier: this is not an exact spending denominator."
      },
      "relatableMetric": {
        "value": "~8.5×",
        "label": "the original contract value by December 2010",
        "kind": "contract growth",
        "explanation": "CityTime project cost by December 2010",
        "caution": "Contract growth is not a calculation of fraud. Different time and scope make this a historical cost-growth comparison, not a unit-efficiency measure. Round to 'about 8.5×', not 'more than 8.5×'.",
        "sources": [
          {
            "title": "DOJ: Three Leaders of CityTime Fraud Scheme Each Sentenced to 20 Years",
            "url": "https://www.justice.gov/usao-sdny/pr/three-leaders-citytime-fraud-scheme-each-sentenced-manhattan-federal-court-20-years",
            "date": "2014-04-28"
          }
        ],
        "formula": "$620M / $73M"
      }
    },
    {
      "id": "fat-leonard-navy",
      "title": "Fat Leonard Navy ship-services bribery",
      "category": "Defense procurement",
      "jurisdiction": "United States Navy / Asia-Pacific ports",
      "classification": "Criminal guilty plea / sentencing",
      "money": {
        "amount": 35000000,
        "unit": "USD",
        "display": "$35 million forfeiture ordered",
        "basis": "Criminal proceeds forfeiture order; separate from $20 million restitution order",
        "asOf": "2024-11-05"
      },
      "status": "Leonard Glenn Francis was sentenced to 15 years in November 2024 following guilty pleas.",
      "evidenceSummary": "DOJ reported Francis admitted bribery and fraud in Navy ship servicing. The sentence included a $35 million proceeds-forfeiture order and $20 million restitution to the Navy; these are orders, not proof that the money has all been collected.",
      "receiptGap": "The cited sentencing record does not contain a complete port-call, work-order, vendor-invoice and payment crosswalk, or a current collection ledger. Full case records would be needed to audit specific charges.",
      "sources": [
        {
          "title": "DOJ: Leonard Glenn Francis Sentenced to 15 Years",
          "url": "https://www.justice.gov/usao-sdca/pr/leonard-glenn-francis-sentenced-15-years-prison-massive-bribery-fraud-and",
          "date": "2024-11-05"
        },
        {
          "title": "U.S. District Court: Leonard Glenn Francis criminal judgment",
          "url": "https://www.govinfo.gov/content/pkg/USCOURTS-casd-3_13-cr-03781/pdf/USCOURTS-casd-3_13-cr-03781-7.pdf",
          "date": "2024-11-25"
        }
      ],
      "caution": "Restitution and forfeiture are different, potentially overlapping measures. This entry concerns Francis; related defendants had differing outcomes.",
      "receiptRequests": [
        "Link port calls and service orders to vendor quotes, itemized invoices and independent proof of delivery.",
        "Publish competition or sole-source reasons and subcontractor ownership where releasable.",
        "Publish the current collection status of restitution and forfeiture orders separately."
      ],
      "proposedChange": "Separate ordering, acceptance and payment roles, protect operationally sensitive details, and sustain ship support through competitively priced verified services.",
      "evidenceGroup": "Proven misconduct",
      "traceability": {
        "scope": "fat-leonard-navy",
        "reviewedOn": "2026-11-08",
        "receipts": [],
        "qualifier": "This file currently links summary-level sources, with no itemized invoice-to-payment records registered against this amount. The pie measures this collection only. Criminal proceeds forfeiture order; separate from $20 million restitution order."
      },
      "relatableMetric": {
        "value": "$35M forfeiture",
        "label": "ordered against one ship-services contractor",
        "kind": "scope context",
        "explanation": "forfeiture ordered against Leonard Francis",
        "caution": "A court order is not proof the money was collected. Do not add forfeiture, restitution and corporate fines as though they are separate taxpayer losses.",
        "sources": [
          {
            "title": "DOJ: Leonard Glenn Francis Sentenced to 15 Years",
            "url": "https://www.justice.gov/usao-sdca/pr/leonard-glenn-francis-sentenced-15-years-prison-massive-bribery-fraud-and",
            "date": "2024-11-05"
          }
        ]
      }
    },
    {
      "id": "arizona-wound-grafts",
      "title": "Arizona wound-graft kickback scheme",
      "category": "Health care",
      "jurisdiction": "Arizona / federal and commercial insurers",
      "classification": "Criminal guilty pleas / sentencing",
      "money": {
        "amount": 1212005778,
        "unit": "USD",
        "display": "$1.212 billion in claims",
        "basis": "False claims submitted to federal and commercial insurance; $614,945,420 collectively paid",
        "asOf": "2025-12-12"
      },
      "status": "DOJ reported Alexandra Gehrke and Jeffrey King sentenced in October 2025 after guilty pleas.",
      "evidenceSummary": "DOJ reported approximately $1.212 billion in false claims from November 2022 to May 2024, including over $960 million submitted to Medicare, TRICARE and CHAMPVA. Federal and commercial insurers collectively paid about $614.9 million.",
      "receiptGap": "The summary is not a claim-by-claim medical-necessity review, proof-of-treatment file, payment allocation by insurer or current asset recovery ledger. Patient information needs privacy protections rather than public exposure.",
      "sources": [
        {
          "title": "DOJ: Wound Graft Company Owners Sentenced for $1.2B Health Care Fraud",
          "url": "https://www.justice.gov/opa/pr/wound-graft-company-owners-sentenced-12b-health-care-fraud-and-agree-pay-309m-resolve-civil",
          "date": "2025-12-12"
        }
      ],
      "caution": "Claims submitted differ from dollars paid, and the total includes private insurers. Restitution, forfeiture and civil settlement amounts may overlap.",
      "receiptRequests": [
        "Provide protected claim-level links to independent medical-necessity findings, clinician orders, treatment and payments.",
        "Publish insurer-level paid amounts and recoveries separately from submitted claims.",
        "Disclose provider ownership and financial referral arrangements to auditors, with public aggregate enforcement outcomes."
      ],
      "proposedChange": "Audit unusually high billing and referral incentives using clinician review, while preserving timely medically necessary wound care and patient appeals.",
      "evidenceGroup": "Proven misconduct",
      "traceability": {
        "scope": "arizona-wound-grafts",
        "reviewedOn": "2026-11-08",
        "receipts": [],
        "qualifier": "This file currently links summary-level sources, with no itemized invoice-to-payment records registered against this amount. The pie measures this collection only. False claims submitted to federal and commercial insurance; $614,945,420 collectively paid."
      },
      "relatableMetric": {
        "value": "~$34.2M / month",
        "label": "average actually paid during the scheme",
        "kind": "time normalized payments",
        "explanation": "payments by federal and commercial insurers on the scheme's claims",
        "caution": "Average over the stated scheme period, not the amount paid in each calendar month. Includes private insurers, not just federal spending. The $1.2B headline is claims submitted, not payments.",
        "sources": [
          {
            "title": "DOJ: Wound Graft Company Owners Sentenced in $1.2B Health Care Fraud",
            "url": "https://www.justice.gov/opa/pr/wound-graft-company-owners-sentenced-12b-health-care-fraud-and-agree-pay-309m-resolve-civil",
            "date": "2025-12-12"
          }
        ],
        "formula": "$614,945,420 / 18 months"
      }
    },
    {
      "id": "usaid-contract-bribery",
      "title": "USAID contracting-officer bribery scheme",
      "category": "Foreign assistance procurement",
      "jurisdiction": "United States / USAID",
      "classification": "Criminal guilty pleas / company admissions",
      "money": {
        "amount": 550000000,
        "unit": "USD",
        "display": "Over $550 million in contracts",
        "basis": "Rounded contract values linked to the scheme, including three contracts that were not awarded; cash payments and government loss are not established by this total",
        "asOf": "2025-06-12"
      },
      "status": "Four individuals pleaded guilty; two companies entered deferred prosecution agreements admitting criminal liability.",
      "evidenceSummary": "DOJ described a bribery scheme involving USAID procurement. The plea table lists about $552.5 million in contract values and $156,034,338 allocated. Three listed contracts worth $286.8 million were not awarded. These measures do not establish cash disbursed or total government loss.",
      "receiptGap": "Contract-level value is available in the release, but this record does not connect every task order, subcontract, invoice, acceptance record and payment to an independently assessed deliverable.",
      "sources": [
        {
          "title": "DOJ: USAID Official and Three Corporate Executives Plead Guilty",
          "url": "https://www.justice.gov/opa/pr/usaid-official-and-three-corporate-executives-plead-guilty-decade-long-bribery-scheme",
          "date": "2025-06-12"
        },
        {
          "title": "DOJ plea statement, contract and allocation table",
          "url": "https://www.justice.gov/criminal/media/1413956/dl?inline=",
          "date": "Reviewed 2026-11-09"
        }
      ],
      "caution": "The $550 million is affected contract value, not proven loss, and this case does not establish misconduct across all USAID spending.",
      "receiptRequests": [
        "Publish award and task-order decisions, conflicts disclosures and competition or exception justifications.",
        "Link prime and subcontract payments to verified deliverables and independent acceptance records.",
        "Reconcile contract values, actual disbursements, proved misconduct amounts and recoveries separately."
      ],
      "proposedChange": "Require procurement conflict checks and independent acceptance with protected reporting channels, preserving effective aid delivery to intended recipients.",
      "evidenceGroup": "Proven misconduct",
      "traceability": {
        "scope": "usaid-contract-bribery",
        "reviewedOn": "2026-11-08",
        "receipts": [],
        "qualifier": "This file currently links summary-level sources, with no itemized invoice-to-payment records registered against this amount. The pie measures this collection only. Value of at least 14 prime contracts involved; not established theft or loss. Preserve the source qualifier: this is not an exact spending denominator."
      },
      "relatableMetric": {
        "value": "14+ contracts / $550M+",
        "label": "affected by one bribery scheme",
        "kind": "scope context",
        "explanation": "value of affected USAID prime contracts",
        "caution": "Contract value is not proven loss. Both figures are lower bounds, so they do not establish an average contract value. Do not divide $550M by 14 and present a bounded result.",
        "sources": [
          {
            "title": "DOJ: USAID Official and Three Corporate Executives Plead Guilty",
            "url": "https://www.justice.gov/opa/pr/usaid-official-and-three-corporate-executives-plead-guilty-decade-long-bribery-scheme",
            "date": "2025-06-12"
          }
        ]
      }
    },
    {
      "id": "nycha-repair-bribery",
      "title": "NYCHA repair-contract bribery sweep",
      "category": "Public housing procurement",
      "jurisdiction": "New York City",
      "classification": "Criminal convictions / guilty pleas",
      "money": {
        "amount": 15000000,
        "unit": "USD",
        "display": "Over $15 million in contracts",
        "basis": "Contract value associated with bribery schemes; over $2.1 million in bribes",
        "asOf": "2025-11-25"
      },
      "status": "DOJ reported all 70 defendants charged in the 2024 sweep had pleaded guilty or been convicted by November 2025.",
      "evidenceSummary": "Employees accepted over $2.1 million in bribes for contracts worth over $15 million. DOJ reported three trial convictions, 56 felony guilty pleas and 11 misdemeanor guilty pleas, with sentencing ongoing at the release date.",
      "receiptGap": "The summary does not show each repair order, competitive price comparison, invoice, inspection or tenant-confirmed completion. Contract value and actual overpayment cannot be equated without that detail.",
      "sources": [
        {
          "title": "DOJ: All 70 NYCHA Employees Charged in 2024 Sweep Convicted",
          "url": "https://www.justice.gov/usao-sdny/pr/all-70-nycha-employees-charged-february-2024-sweep-convicted-bribery-fraud-or",
          "date": "2025-11-25"
        }
      ],
      "caution": "The $15 million is contract value, not a finding that every repair was fictitious. Bribes, restitution and forfeiture are different measures.",
      "receiptRequests": [
        "Link each small repair contract to the work order, selection rationale, invoice and independent completion inspection.",
        "Publish vendor ownership and repeat-award patterns alongside comparable unit prices.",
        "Give tenants a simple way to verify completion or report unresolved work without retaliation."
      ],
      "proposedChange": "Separate contractor selection from repair sign-off and audit repeated awards, while prioritizing safe, prompt repairs for residents.",
      "evidenceGroup": "Proven misconduct",
      "traceability": {
        "scope": "nycha-repair-bribery",
        "reviewedOn": "2026-11-08",
        "receipts": [],
        "qualifier": "This file currently links summary-level sources, with no itemized invoice-to-payment records registered against this amount. The pie measures this collection only. Contract value associated with bribery schemes; over $2.1 million in bribes. Preserve the source qualifier: this is not an exact spending denominator."
      },
      "relatableMetric": {
        "value": ">$30,000 / employee",
        "label": "average bribes per convicted employee",
        "kind": "per defendant average",
        "explanation": "bribes collectively received by the charged NYCHA employees",
        "caution": "An average, not what each individual received. More than $15M in affected contract value is not established loss; do not derive a bribe rate from two lower-bound figures.",
        "sources": [
          {
            "title": "DOJ: All 70 NYCHA Employees Charged in February 2024 Sweep Convicted",
            "url": "https://www.justice.gov/usao-sdny/pr/all-70-nycha-employees-charged-february-2024-sweep-convicted-bribery-fraud-or",
            "date": "2025-11-25"
          }
        ],
        "formula": ">$2.1M / 70 employees"
      }
    },
    {
      "id": "labsolutions-genetic-tests",
      "title": "LabSolutions genetic-testing fraud",
      "category": "Health care",
      "jurisdiction": "Georgia / Medicare",
      "classification": "Criminal conviction / sentencing",
      "money": {
        "amount": 187000000,
        "unit": "USD",
        "display": "Over $187 million paid",
        "basis": "Medicare paid to LabSolutions on over $463 million in claims described in the prosecution",
        "asOf": "2023-08-18"
      },
      "status": "DOJ reported Minal Patel sentenced to 27 years in August 2023 after conviction.",
      "evidenceSummary": "DOJ reported LabSolutions submitted over $463 million in claims from July 2016 to August 2019 and Medicare paid over $187 million. The case involved medically unnecessary testing, kickbacks and physicians approving orders without evaluating medical necessity.",
      "receiptGap": "The sentencing summary does not provide a privacy-protected claim-to-order-to-test-to-payment dataset or current recovery ledger. A source link is not verification of all underlying clinical records.",
      "sources": [
        {
          "title": "DOJ: Lab Owner Sentenced for $463M Genetic Testing Scheme",
          "url": "https://www.justice.gov/archives/opa/pr/lab-owner-sentenced-463m-genetic-testing-scheme",
          "date": "2023-08-18"
        }
      ],
      "caution": "Claims, payments and the broader Operation Double Helix enforcement totals have different scopes. This entry concerns one defendant’s case.",
      "receiptRequests": [
        "Provide protected claim-level links between physician orders, medical necessity, laboratory work and Medicare payments.",
        "Publish aggregate referral-payment and ownership relationships reviewed by auditors.",
        "Reconcile the paid amount with recoveries and final court orders, separately from total billed claims."
      ],
      "proposedChange": "Use independent medical review and referral-payment checks, with prompt correction and appeals so necessary testing remains accessible.",
      "evidenceGroup": "Proven misconduct",
      "traceability": {
        "scope": "labsolutions-genetic-tests",
        "reviewedOn": "2026-11-08",
        "receipts": [],
        "qualifier": "This file currently links summary-level sources, with no itemized invoice-to-payment records registered against this amount. The pie measures this collection only. Medicare paid to LabSolutions on over $463 million in claims described in the prosecution. Preserve the source qualifier: this is not an exact spending denominator."
      },
      "relatableMetric": {
        "value": ">$187M actually paid",
        "label": "Medicare payments to one lab",
        "kind": "scope context",
        "explanation": "Medicare payments to LabSolutions",
        "caution": "The $463M headline is bills submitted; over $187M was paid. No supported patient or test count was found. Both values are lower bounds and do not yield an exact paid-to-billed percentage.",
        "sources": [
          {
            "title": "DOJ: Lab Owner Sentenced for $463M Genetic Testing Scheme",
            "url": "https://www.justice.gov/archives/opa/pr/lab-owner-sentenced-463m-genetic-testing-scheme",
            "date": "2023-08-18"
          }
        ]
      }
    },
    {
      "id": "health-net-va-billing",
      "title": "Health Net VA duplicate and inflated billing",
      "category": "Veterans health care",
      "jurisdiction": "United States / Department of Veterans Affairs",
      "classification": "Civil settlement; no liability determination",
      "money": {
        "amount": 97237391,
        "unit": "USD",
        "display": "$97.24 million repaid",
        "basis": "$93,682,428 in overpayments plus $3,554,963 in interest",
        "asOf": "2021-04-06"
      },
      "status": "DOJ reported payment to resolve duplicate and inflated claims allegations; there was no determination of liability.",
      "evidenceSummary": "DOJ said a VA OIG audit and follow-up investigation led Health Net to repay about $93.7 million plus interest. Its $5.05 billion underlying contract value is a separate measure, not alleged fraud loss.",
      "receiptGap": "The settlement summary does not assemble the complete provider-payment and VA-reimbursement crosswalk, duplicate-detection rules or underlying audit sample. No invoice coverage rate is available here.",
      "sources": [
        {
          "title": "DOJ: Health Net Federal Services Pays over $97M for Overstated Billings to the VA",
          "url": "https://www.justice.gov/usao-edca/pr/health-net-federal-services-pays-over-97m-overstated-billings-va",
          "date": "2021-04-06"
        },
        {
          "title": "VA OIG bulk-payment audit, table 7 and recovery note",
          "url": "https://www.vaoig.gov/sites/default/files/reports/2018-09/VAOIG-17-02713-231.pdf",
          "date": "Reviewed 2026-11-09"
        }
      ],
      "caution": "The claims were settled as allegations only. A civil repayment does not establish criminal fraud.",
      "receiptRequests": [
        "Link provider claims and payments to VA reimbursements with duplicate detection identifiers.",
        "Publish the audit’s tested population, error method and reconciliation of withheld provider discounts.",
        "Publish recovered principal and interest separately and document corrected billing controls."
      ],
      "proposedChange": "Require a traceable provider-to-VA payment reconciliation and automatic duplicate alerts with human review, while protecting veterans’ access to community care.",
      "evidenceGroup": "Allegations and settlements",
      "traceability": {
        "scope": "health-net-va-billing",
        "reviewedOn": "2026-11-08",
        "receipts": [],
        "qualifier": "This file currently links summary-level sources, with no itemized invoice-to-payment records registered against this amount. The pie measures this collection only. $93,682,428 in overpayments plus $3,554,963 in interest."
      },
      "relatableMetric": {
        "value": "$93.7M + interest",
        "label": "repaid on one VA contract",
        "kind": "scope context",
        "explanation": "principal overpayments repaid under the settlement",
        "caution": "Settlement resolved allegations, not a determination of liability. The $97.2M total includes interest. Original $5.05B award value is not actual spending, so avoid labeling principal/award a spending-error rate.",
        "sources": [
          {
            "title": "DOJ: Health Net Federal Services Pays Over $97M for Overstated Billings to VA",
            "url": "https://www.justice.gov/usao-edca/pr/health-net-federal-services-pays-over-97m-overstated-billings-va",
            "date": "2021-04-06"
          }
        ]
      }
    },
    {
      "id": "booz-allen-cost-allocation",
      "title": "Booz Allen government-contract cost allocation",
      "category": "Federal procurement",
      "jurisdiction": "United States",
      "classification": "Civil settlement; no liability determination",
      "money": {
        "amount": 377453150,
        "unit": "USD",
        "display": "$377.45 million settlement",
        "basis": "False Claims Act settlement; not a separately adjudicated loss amount",
        "asOf": "2023-07-21"
      },
      "status": "Booz Allen agreed to resolve allegations that commercial and international costs were improperly charged to government contracts.",
      "evidenceSummary": "The settlement concerns alleged allocation of non-government business costs to government contracts during approximately 2011–2021. DOJ explicitly says the claims were allegations and there was no liability determination.",
      "receiptGap": "The public summary does not contain the underlying timesheets, indirect-cost pools, allocation methods and invoice-level reconciliation needed to reproduce the result.",
      "sources": [
        {
          "title": "DOJ: Booz Allen Agrees to Pay $377.45 Million to Settle False Claims Act Allegations",
          "url": "https://www.justice.gov/archives/opa/pr/booz-allen-agrees-pay-37745-million-settle-false-claims-act-allegations",
          "date": "2023-07-21"
        }
      ],
      "caution": "A settlement is not a conviction. Settlement dollars need not equal actual economic loss.",
      "receiptRequests": [
        "Provide auditors complete indirect-cost pools, allocation methods and source timesheets.",
        "Link each government invoice to the benefits received by the relevant contract.",
        "Publish the settlement payment status and corrective-control testing, without labeling allegations as adjudicated facts."
      ],
      "proposedChange": "Require auditable cost allocation and independent checks on cross-subsidies, preserving valid contracted services and a fair dispute process.",
      "evidenceGroup": "Allegations and settlements",
      "traceability": {
        "scope": "booz-allen-cost-allocation",
        "reviewedOn": "2026-11-08",
        "receipts": [],
        "qualifier": "This file currently links summary-level sources, with no itemized invoice-to-payment records registered against this amount. The pie measures this collection only. False Claims Act settlement; not a separately adjudicated loss amount."
      },
      "relatableMetric": {
        "value": "$377.45M settlement",
        "label": "to resolve allegations over contract cost allocation",
        "kind": "scope context",
        "explanation": "The concrete mechanism is government contracts allegedly bearing costs benefiting commercial and international work.",
        "caution": "Settlement of allegations, not a finding that the entire amount is fraud or a calculation of annual overbilling. No defensible beneficiaries, contract count or labor-hour denominator was found.",
        "sources": [
          {
            "title": "DOJ: Booz Allen Agrees to Pay $377.45 Million",
            "url": "https://www.justice.gov/archives/opa/pr/booz-allen-agrees-pay-37745-million-settle-false-claims-act-allegations",
            "date": "2023-07-21"
          }
        ]
      }
    },
    {
      "id": "louis-berger-overhead",
      "title": "Louis Berger reconstruction-contract overhead fraud",
      "category": "Foreign assistance / reconstruction",
      "jurisdiction": "U.S. contracts in Iraq and Afghanistan",
      "classification": "Criminal guilty pleas / deferred prosecution",
      "money": {
        "amount": 69300000,
        "unit": "USD",
        "display": "$69.3 million resolution",
        "basis": "$18.7 million criminal penalties and $50.6 million civil settlement",
        "asOf": "2010-11-05"
      },
      "status": "Two former senior employees pleaded guilty; company entered a deferred prosecution agreement and civil settlement in 2010.",
      "evidenceSummary": "DOJ described intentionally inflated overhead rates, including shifting non-federal overhead and employee time onto federal work. The resolution combined criminal penalties and a civil settlement; it is not the total value of reconstruction projects.",
      "receiptGap": "This record links the enforcement summary, not the full cost-allocation workpapers, original timesheets, invoices, accepted construction records and payments for each project.",
      "sources": [
        {
          "title": "DOJ: Scheme to Defraud Government on Reconstruction Contracts Leads to Criminal Charges and Civil Penalties for Louis Berger Group",
          "url": "https://www.justice.gov/archive/usao/md/news/archive/SchemetoDefraudGovernmentLeadstoCriminalChargesandCivilPenaltiesforLouisBergerGroupInc.html",
          "date": "2010-11-05"
        }
      ],
      "caution": "The combined resolution includes penalties. Do not equate it to all project spending or imply that every reconstruction deliverable was absent.",
      "receiptRequests": [
        "Provide auditors original timesheets, overhead pools and reclassification history linked to federal invoices.",
        "Link reconstruction payments to independently accepted project outputs.",
        "Publish criminal penalties, civil recovery and restitution separately, with current collection status."
      ],
      "proposedChange": "Require immutable cost-allocation records and independent field acceptance while continuing verified reconstruction and essential public services.",
      "evidenceGroup": "Proven misconduct",
      "traceability": {
        "scope": "louis-berger-overhead",
        "reviewedOn": "2026-11-08",
        "receipts": [],
        "qualifier": "This file currently links summary-level sources, with no itemized invoice-to-payment records registered against this amount. The pie measures this collection only. $18.7 million criminal penalties and $50.6 million civil settlement."
      },
      "relatableMetric": {
        "value": ">$1.40 per $1 labor",
        "label": "targeted overhead and profit per direct-labor dollar",
        "kind": "unit cost context",
        "explanation": "overhead expenses and profits under the targeted overhead rate",
        "caution": "The entire overhead charge was not necessarily fraudulent. Criminal conduct involved inflating the rate and shifting costs; overhead and profit are not inherently improper.",
        "sources": [
          {
            "title": "DOJ: Scheme to Defraud Government Leads to Criminal Charges and Civil Penalties for Louis Berger Group",
            "url": "https://www.justice.gov/archive/usao/md/news/archive/SchemetoDefraudGovernmentLeadstoCriminalChargesandCivilPenaltiesforLouisBergerGroupInc.html",
            "date": "2010-11-05"
          }
        ],
        "formula": "Target overhead rate >140% × $1 direct labor"
      }
    },
    {
      "id": "katrina-rita-individual-assistance",
      "title": "Katrina and Rita individual-assistance payment failures",
      "category": "Disaster relief",
      "jurisdiction": "United States / FEMA",
      "classification": "Audit estimate of improper and potentially fraudulent payments",
      "money": {
        "amount": 600000000,
        "upperAmount": 1400000000,
        "unit": "USD",
        "display": "$600 million–$1.4 billion",
        "basis": "GAO 95% confidence range for improper and potentially fraudulent payments through February 2006",
        "asOf": "2006-06-14"
      },
      "status": "Historical audit finding; GAO estimated about $1 billion at the midpoint based on invalid registration information.",
      "evidenceSummary": "GAO sampled assistance payments and estimated that about 16% were improper or potentially fraudulent because registrations used invalid identities, invalid addresses or duplicate information. This was not a finding of criminal fraud for every payment.",
      "receiptGap": "The audit estimated from a sample rather than testing the entire population. This entry does not provide a payment-by-payment final eligibility, appeal and recovery accounting.",
      "sources": [
        {
          "title": "GAO-06-844T: Hurricanes Katrina and Rita Disaster Relief",
          "url": "https://www.gao.gov/assets/gao-06-844t.pdf",
          "date": "2006-06-14"
        }
      ],
      "caution": "Historical dollars, not inflation-adjusted. Improper payments and potential fraud are combined in the estimate; neither is synonymous with a final criminal loss.",
      "receiptRequests": [
        "Publish a privacy-protected reconciliation of aid payments, duplicate findings, eligibility corrections, waivers, appeals and recoveries.",
        "Publish sample selection, confidence ranges and which error categories were or were not tested.",
        "Give independent auditors secure access to identity, residence and damage verification for sampled payments."
      ],
      "proposedChange": "Use rapid identity and duplicate checks with emergency exceptions and accessible appeals so disaster survivors can receive prompt, lawful aid.",
      "evidenceGroup": "Estimated exposure",
      "traceability": {
        "scope": "katrina-rita-individual-assistance",
        "reviewedOn": "2026-11-08",
        "receipts": [],
        "qualifier": "This file currently links summary-level sources, with no itemized invoice-to-payment records registered against this amount. The pie measures this collection only. GAO 95% confidence range for improper and potentially fraudulent payments through February 2006. The reported figure is a range; zero matched dollars is 0% throughout that range."
      },
      "relatableMetric": {
        "value": "~16%",
        "label": "of payments estimated improper or potentially fraudulent",
        "kind": "same scope rate",
        "explanation": "improper and potentially fraudulent individual-assistance payments",
        "caution": "Combined improper-payment and potential-fraud estimate, not proven fraud. The 95% confidence range was $600M–$1.4B. Study scope concerned invalid registration information.",
        "sources": [
          {
            "title": "GAO-06-844T: Hurricanes Katrina and Rita Disaster Relief",
            "url": "https://www.gao.gov/assets/gao-06-844t.pdf",
            "date": "2006-06-14"
          }
        ],
        "formula": "Use GAO's published approximately 16% statistical estimate."
      }
    },
    {
      "id": "california-operation-skip-trace",
      "title": "Operation Skip Trace alleged hospice billing fraud",
      "category": "Health care",
      "jurisdiction": "California / Medi-Cal",
      "classification": "Criminal charges / allegations",
      "money": {
        "amount": 267000000,
        "unit": "USD",
        "display": "About $267 million billed",
        "basis": "California DOJ's alleged fraudulent billing total; not established paid loss",
        "asOf": "2026-04-09"
      },
      "status": "California DOJ announced charges against 21 suspects in April 2026. The cited source does not establish final outcomes.",
      "evidenceSummary": "Prosecutors alleged stolen identities were enrolled in Medi-Cal and 14 hospice companies billed approximately $267 million for services not rendered. These are allegations at the charging stage.",
      "receiptGap": "The charging announcement is not a complete claims ledger or final adjudication. Paid amounts, reversals, recovered assets and proof for each claim are not reconciled in this record.",
      "sources": [
        {
          "title": "California DOJ: Operation Skip Trace hospice fraud charges",
          "url": "https://oag.ca.gov/news/press-releases/attorney-general-bonta-dismantles-los-angeles-hospice-fraud-ring-responsible-267",
          "date": "2026-04-09"
        }
      ],
      "caution": "Defendants are presumed innocent unless proven guilty. The $267 million is alleged billing, not a demonstrated loss or conviction total.",
      "receiptRequests": [
        "Publish aggregate reconciliation of claimed, paid, stopped and recovered amounts for the charged providers.",
        "Provide investigators protected links between enrollment, clinician certification, alleged services and each claim.",
        "Publish case outcomes and distinguish unresolved allegations from final findings."
      ],
      "proposedChange": "Strengthen enrollment and service checks with clinical review, while ensuring continuity of legitimate hospice care and due process for patients and providers.",
      "evidenceGroup": "Allegations and settlements",
      "traceability": {
        "scope": "california-operation-skip-trace",
        "reviewedOn": "2026-11-08",
        "receipts": [],
        "qualifier": "This file currently links summary-level sources, with no itemized invoice-to-payment records registered against this amount. The pie measures this collection only. California DOJ's alleged fraudulent billing total; not established paid loss."
      },
      "relatableMetric": {
        "value": "~$19.1M / company",
        "label": "average alleged billing across 14 companies",
        "kind": "per provider average",
        "explanation": "alleged fraudulent hospice billing",
        "caution": "Allegations, not convictions. Average across companies, not equal billing. Billing is not proof of the amount paid or taxpayer loss.",
        "sources": [
          {
            "title": "California Attorney General: Operation Skip Trace Hospice Fraud Charges",
            "url": "https://oag.ca.gov/news/press-releases/attorney-general-bonta-dismantles-los-angeles-hospice-fraud-ring-responsible-267",
            "date": "2026-04-09"
          }
        ],
        "formula": "$267M / 14 companies"
      }
    },
    {
      "id": "federal-fraud-estimate",
      "title": "Government-wide federal fraud estimate",
      "category": "Federal payment integrity",
      "jurisdiction": "United States / government-wide",
      "classification": "Statistical fraud estimate; agency disagreement",
      "evidenceGroup": "Estimated exposure",
      "money": {
        "amount": 233000000000.0,
        "unit": "USD",
        "display": "$233–521 billion a year",
        "basis": "GAO annual statistical fraud-loss estimate using FY2018–FY2022 data. It is not a five-year sum or a forecast.",
        "asOf": "FY2018–FY2022 analysis; published 2024-04-16",
        "upperAmount": 521000000000.0
      },
      "promise": "Protect federal funds from fraud while delivering authorized services.",
      "status": "Government-wide model with uncertainty",
      "evidenceSummary": "GAO estimated annual federal fraud losses across government. Its model covers detected and undetected fraud, with substantial uncertainty.",
      "receiptGap": "The model is not a transaction ledger. Individual payments, detection dates and preventable losses remain unidentified.",
      "sources": [
        {
          "title": "GAO government-wide fraud estimate and limits",
          "url": "https://www.gao.gov/products/gao-24-105833",
          "date": "2024-04-16"
        }
      ],
      "caution": "OMB disagreed with the estimate. Do not apply the range to individual agencies, project future losses or add overlapping case estimates.",
      "receiptRequests": [
        "A reconciled ledger of adjudicated and suspected fraudulent payments and their dates.",
        "Dates when controls detected each scheme, action taken and recoveries."
      ],
      "proposedChange": "Require consistent fraud reporting, linked payments and independent checks. Act on substantiated problems while maintaining legitimate services.",
      "traceability": {
        "scope": "federal-fraud-estimate",
        "reviewedOn": "2026-11-09",
        "receipts": [],
        "qualifier": "Receipt matching measures this collection only. The reported estimate is not a payment denominator."
      },
      "relatableMetric": {
        "value": "3%–7%",
        "label": "of average federal obligations in GAO’s model",
        "kind": "government-wide modeled rate",
        "explanation": "The modeled annual loss range is equivalent to roughly $3–$7 per $100 of average obligations in the studied period.",
        "caution": "This government-wide relationship cannot be applied to any individual agency or program, and it does not forecast future losses.",
        "sources": [
          {
            "title": "GAO government-wide fraud estimate and limits",
            "url": "https://www.gao.gov/products/gao-24-105833",
            "date": "2024-04-16"
          }
        ]
      }
    },
    {
      "id": "federal-improper-payments-2025",
      "title": "Federal improper payments, FY2025",
      "category": "Federal payment integrity",
      "jurisdiction": "United States / 64 reporting programs",
      "classification": "Audit of agency payment-error estimates",
      "evidenceGroup": "Audit and oversight findings",
      "money": {
        "amount": 186000000000.0,
        "unit": "USD",
        "display": "About $186 billion",
        "basis": "Estimated improper payments reported by 15 agencies across 64 programs for FY2025. About $153 billion was overpayments.",
        "asOf": "FY2025; published 2026-04-27"
      },
      "promise": "Pay eligible recipients the correct amount and correct errors promptly.",
      "status": "Estimated payment errors; mixed causes",
      "evidenceSummary": "Agencies reported about $186 billion in improper payments for FY2025. These errors include several causes and require different remedies.",
      "receiptGap": "The aggregate does not identify each payment, whether it was fraud, or whether a correction or recovery already occurred.",
      "sources": [
        {
          "title": "GAO FY2025 improper payments and overpayments",
          "url": "https://www.gao.gov/products/gao-26-108694",
          "date": "2026-04-27"
        }
      ],
      "caution": "Improper payments include underpayments and documentation errors. The calculator uses only the $153 billion overpayment component and keeps it separate from fraud estimates.",
      "receiptRequests": [
        "Dated overpayments by program, cause and recovery status.",
        "Evidence distinguishing incorrect amounts from documentation gaps and underpayments."
      ],
      "proposedChange": "Check amounts and eligibility before release, correct missing records and recover genuine overpayments. Preserve benefits owed and accessible appeals.",
      "traceability": {
        "scope": "federal-improper-payments-2025",
        "reviewedOn": "2026-11-09",
        "receipts": [],
        "qualifier": "Receipt matching measures this collection only. The reported estimate is not a payment denominator."
      },
      "relatableMetric": {
        "value": "82%",
        "label": "of the reported total was overpayments",
        "kind": "payment-error composition",
        "explanation": "About $153 billion of the $186 billion estimate was overpayments.",
        "caution": "Overpayments have varied causes. The other error categories, including underpayments, are excluded from the payment-stop calculator.",
        "sources": [
          {
            "title": "GAO FY2025 improper payments and overpayments",
            "url": "https://www.gao.gov/products/gao-26-108694",
            "date": "2026-04-27"
          }
        ]
      }
    },
    {
      "id": "medicaid-payment-errors-2025",
      "title": "Medicaid payment errors, FY2025 reporting",
      "category": "Health care",
      "jurisdiction": "United States / Medicaid",
      "classification": "Estimated improper payments; documentation gaps",
      "evidenceGroup": "Audit and oversight findings",
      "money": {
        "amount": 37390000000.0,
        "unit": "USD",
        "display": "$37.39 billion",
        "basis": "CMS FY2025 improper-payment estimate pooling 2023, 2024 and 2025 state-review cycles. It is not a dated FY2025 loss ledger.",
        "asOf": "FY2025 reporting; published 2026-01-15"
      },
      "promise": "Pay correctly for covered care for eligible Medicaid beneficiaries.",
      "status": "Payment-review estimate across three cycles",
      "evidenceSummary": "CMS reported $37.39 billion in estimated Medicaid improper payments. Most identified errors involved insufficient documentation.",
      "receiptGap": "The pooled review lacks a single-year payment timeline and does not establish which flagged amounts were genuine, avoidable overpayments.",
      "sources": [
        {
          "title": "CMS FY2025 improper payments fact sheet",
          "url": "https://www.cms.gov/newsroom/fact-sheets/fiscal-year-2025-improper-payments-fact-sheet",
          "date": "2026-01-15"
        },
        {
          "title": "CMS 2025 Medicaid and CHIP supplemental data, table S2A",
          "url": "https://www.cms.gov/files/document/2025-medicaid-chip-supplemental-improper-payment-data.pdf",
          "date": "Reviewed 2026-11-09"
        },
        {
          "title": "CMS PERM manual, sampling payment dates and cycles",
          "url": "https://www.cms.gov/files/document/perm-manual.pdf-2",
          "date": "Reviewed 2026-11-09"
        }
      ],
      "caution": "CMS says insufficient documentation is generally not indicative of fraud or abuse. These amounts overlap the federal improper-payment review.",
      "receiptRequests": [
        "Payment-level dates, error reasons and corrected supporting records.",
        "Confirmed overpayments, repayments and proof that eligible patients retained care."
      ],
      "proposedChange": "Verify provider and eligibility records, correct documentation and target substantiated overpayments. Preserve eligible patients’ coverage and timely care.",
      "traceability": {
        "scope": "medicaid-payment-errors-2025",
        "reviewedOn": "2026-11-09",
        "receipts": [],
        "qualifier": "Receipt matching measures this collection only. The reported estimate is not a payment denominator."
      },
      "relatableMetric": {
        "value": "77.17%",
        "label": "of estimated errors involved insufficient documentation",
        "kind": "documentation share",
        "explanation": "CMS attributes more than three quarters of the estimated improper-payment amount to insufficient documentation.",
        "caution": "Missing documentation does not establish fraud, an unnecessary service or a payment that should have been stopped.",
        "sources": [
          {
            "title": "CMS FY2025 improper payments fact sheet",
            "url": "https://www.cms.gov/newsroom/fact-sheets/fiscal-year-2025-improper-payments-fact-sheet",
            "date": "2026-01-15"
          }
        ]
      }
    },
    {
      "id": "medicare-ffs-payment-errors-2025",
      "title": "Medicare fee-for-service payment errors, FY2025",
      "category": "Health care",
      "jurisdiction": "United States / Medicare fee-for-service",
      "classification": "Estimated improper payments; mixed error causes",
      "evidenceGroup": "Audit and oversight findings",
      "money": {
        "amount": 28830000000.0,
        "unit": "USD",
        "display": "$28.83 billion",
        "basis": "CMS FY2025 fee-for-service improper-payment estimate. This is a review estimate rather than a transaction-level fraud total.",
        "asOf": "FY2025 reporting; published 2026-01-15"
      },
      "promise": "Pay correctly for medically necessary covered services.",
      "status": "Sample-based payment-error estimate",
      "evidenceSummary": "CMS estimated $28.83 billion in improper fee-for-service payments. Review findings include payment errors and insufficient supporting records.",
      "receiptGap": "The top-line estimate does not separate every preventable overpayment from underpayments and documentation problems or provide a payment timeline.",
      "sources": [
        {
          "title": "CMS FY2025 improper payments fact sheet",
          "url": "https://www.cms.gov/newsroom/fact-sheets/fiscal-year-2025-improper-payments-fact-sheet",
          "date": "2026-01-15"
        },
        {
          "title": "CMS 2025 Medicare FFS supplemental data, table A4",
          "url": "https://www.cms.gov/files/document/nov-2025-medicare-ffs-supplemental-improper-payment-data-2025922.pdf",
          "date": "Reviewed 2026-11-09"
        },
        {
          "title": "CMS 2025 CERT public-data dictionary",
          "url": "https://data.cms.gov/data-api/v1/dataset/dc7c7abe-57bf-41e5-a858-1d04d431d542/dictionary",
          "date": "Reviewed 2026-11-09"
        }
      ],
      "caution": "Payment-error measurement does not measure fraud. This program is included in broader federal improper-payment reporting.",
      "receiptRequests": [
        "Dated claims with error categories, corrected records and appeal outcomes.",
        "Confirmed avoidable overpayments, repayments and patient-access checks."
      ],
      "proposedChange": "Improve claim documentation and clinical review, correct errors promptly and recover established overpayments while maintaining medically necessary care.",
      "traceability": {
        "scope": "medicare-ffs-payment-errors-2025",
        "reviewedOn": "2026-11-09",
        "receipts": [],
        "qualifier": "Receipt matching measures this collection only. The reported estimate is not a payment denominator."
      },
      "relatableMetric": {
        "value": "6.55%",
        "label": "estimated improper-payment rate",
        "kind": "estimated payment-error rate",
        "explanation": "CMS’s review estimated that $6.55 per $100 failed applicable payment requirements.",
        "caution": "This rate includes varied error types and cannot be treated as a fraud rate or a percentage of care that should be denied.",
        "sources": [
          {
            "title": "CMS FY2025 improper payments fact sheet",
            "url": "https://www.cms.gov/newsroom/fact-sheets/fiscal-year-2025-improper-payments-fact-sheet",
            "date": "2026-01-15"
          }
        ]
      }
    }
  ],
  "costRule": "Completed-work price comparisons are scoped to matching contracts. Original prices and user scenarios are not independent current valuations; cost differences do not establish fraud.",
  "relatableMetricRule": "Per-person, annual-average and growth comparisons retain their numerator, denominator, period and caveats. A one-night population count is not an annual service population. Allocations are not actual spending."
}