Illinois / Federal
FutureGen 2.0 plant, pipeline and storage
FutureGen 2.0 received about $200.52 million in federal funding, but its plant and pipeline/storage projects stopped before construction. Auditors found that early funding limits and cost-sharing rules had been relaxed.
Audit findings; construction never began
Ask Impact Analyst
Ask about the numbers or evidence. Keep the conversation going with follow-up questions.
By sending, you agree to share your question and this case’s notes with Google Gemini and save the conversation privately for review. Privacy
What was the money for?
Develop a power plant with carbon capture, a pipeline and underground storage.
The Government Accountability Office’s 2021 review reports $116.67 million for the plant and $83.86 million for pipeline and storage. These are two awards for the same project group.
Exact amount, time period and source wording
Actual DOE funding: $116,666,759 plant plus $83,857,100 pipeline/storage; two distinct awards
Period: GAO 2021 review
Putting the amount in context
the funding planned for the stages reached
Together, the two awards received about 2.34 times the funding originally planned for the stages they reached.
What this comparison means: This compares early-stage funding, not a complete plant budget. It does not establish fraud or mean no design work was done.
How we calculated this and where it comes from
(83,857,100 + 116,666,759) / (46,030,081 + 39,771,244)
Design-phase funding comparison, not full plant budget or measured fraud.
What actually happened?
Both awards reached design work, but their funding agreements ended before construction.
Keep in mind: Design work occurred. These two awards are already included in the audit’s broader project total and must not be counted twice.
Read the detailed findings
GAO found DOE exceeded planned early-phase funding and relaxed cost-sharing requirements. The two FutureGen components reached design but were not built.
Reported status: Both funding agreements terminated before construction.
The amount combines two FutureGen 2.0 awards already included in the report’s broader four-project aggregate.
Can we follow the payments?
A report can tell us the total. To follow the money, we also need to connect each bill to a payment and to what was received.
Early-intervention calculation review
What could a three-month checkpoint have saved?
Obtain award drawdowns and closeout statements for both recipients. Account for accepted design work and returned funds.
A savings amount remains uncalculated until the missing evidence is assembled.
Payment-record search · Funding total; dates missing
GAO reports $200,523,859 in DOE funding across the two FutureGen 2.0 awards. The reviewed table does not provide the disbursement dates or final closeout adjustments. DOE reported $92 million in FutureGen-program outlays in a 2013 Senate budget response. The response does not reconcile that program total to the two FutureGen 2.0 awards.
Still needed Obtain award drawdowns and closeout statements for both recipients. Account for accepted design work and returned funds.
Reviewed November 9, 2026
Complete invoice-to-payment links
- Invoice
- What was charged.
- Payment record
- What was paid.
- Delivery record
- What was received.
Invoice + payment record
$0 linked hereNo matching invoice and payment records have been added to this file.
The circle shows the share of the displayed total with those records. Blue means linked here; gray means not linked here.
0% means no matching records are linked in this file. It does not describe every record the government holds or prove that money was lost or stolen.
Help make invoices, payments and proof of delivery public.
Support the Receipts ActHow this is measured and which records are linked
This file currently links summary-level sources, with no itemized invoice-to-payment records registered against this amount. The pie measures this collection only. Actual DOE funding: $116,666,759 plant plus $83,857,100 pipeline/storage; two distinct awards.
Only invoice and payment records tied to this same amount and scope count. Delivery coverage also requires a linked acceptance record. A report showing a total does not count as an individual receipt.
- Invoice, payment and delivery linked
- $0
- Invoice and payment linked; delivery not linked
- $0
- No matched invoice and payment in this file
- $200,523,859
0 matching invoice/payment records; 0 also link to delivery.
No individual invoice-to-payment records are registered in this file yet. This does not establish that those records do not exist elsewhere.
What is still missing?
What design work was accepted for each payment, and what could still be used after the awards ended?
Which records would help answer this?
GAO provides award-level actual funding and phases, not a complete public transaction-to-deliverable ledger. Design expenditure is not proof no work occurred.
- Connect federal reimbursements and utility payments to invoices, work packages and accepted engineering milestones.
- Publish final termination costs, recovery amounts and the disposition or reuse of equipment and facilities.
- Separate taxpayer funding, ratepayer charges and private investment in a reconciled ledger.
These records have not all been assembled here. They may exist elsewhere. Personal details should stay protected.
Can we estimate how much was wasted or stolen?
This file does not establish an independent value for everything delivered. Subtracting a guessed value from a headline amount would not establish fraud. A sound estimate needs matching costs, delivered results and evidence about why any money was lost.
Sources and research notes (2 documents)
These documents support the case. A source document can describe many payments; it is not itself an itemized receipt.
- GAO-22-105111, tables 1 and 3
gao.gov · 2021-12
- DOE FY2014 budget hearing, written response, page 71