Hydrogen Energy California carbon capture
This carbon-capture project received about $153.43 million in federal funding but never started construction. Auditors found that funding controls had been bypassed.
Audit findings; construction never began
Ask Impact Analyst
Ask about the numbers or evidence. Keep the conversation going with follow-up questions.
By sending, you agree to share your question and this case’s notes with Google Gemini and save the conversation privately for review. Privacy
What was the money for?
Develop a coal-based power project with carbon capture in California.
The $153.43 million is actual Energy Department project funding reported in a 2021 federal audit. It is not a court-established loss.
Exact amount, time period and source wording
Actual DOE project funding reported by GAO
Period: GAO 2021 review
Putting the amount in context
the funding planned for the stage reached
Reported federal funding of $153.43 million was about 2.05 times the $75 million planned for that stage.
What this comparison means: This is an early-stage funding comparison, not the full plant budget or a fraud estimate.
How we calculated this and where it comes from
153,428,898 / 75,000,000
Phase-specific federal award comparison, not full plant budget or measured fraud.
What actually happened?
The funding agreement ended before construction began.
Keep in mind: The audit found management and funding-control problems, not a fraud conviction.
Read the detailed findings
GAO places the project among four unbuilt coal carbon-capture demonstrations where DOE bypassed funding controls and increased early-phase exposure.
Reported status: Funding agreement terminated; construction did not begin.
The amount is included in the report’s broader four-project aggregate. The findings concern management and cost controls, not a fraud conviction.
Can we follow the payments?
A report can tell us the total. To follow the money, we also need to connect each bill to a payment and to what was received.
Early-intervention calculation review
What could a three-month checkpoint have saved?
Obtain federal drawdowns by date, cost-share reconciliations, retained work and closeout recoveries.
A savings amount remains uncalculated until the missing evidence is assembled.
Payment-record search · Funding total; dates missing
GAO reports $153,428,898 in DOE funding. The earlier audit’s $75 million spent by March 2011 combines federal and private money, so it cannot define an earlier federal-payment total.
Still needed Obtain federal drawdowns by date, cost-share reconciliations, retained work and closeout recoveries.
Reviewed November 9, 2026
Complete invoice-to-payment links
- Invoice
- What was charged.
- Payment record
- What was paid.
- Delivery record
- What was received.
Invoice + payment record
$0 linked hereNo matching invoice and payment records have been added to this file.
The circle shows the share of the displayed total with those records. Blue means linked here; gray means not linked here.
0% means no matching records are linked in this file. It does not describe every record the government holds or prove that money was lost or stolen.
Help make invoices, payments and proof of delivery public.
Support the Receipts ActHow this is measured and which records are linked
This file currently links summary-level sources, with no itemized invoice-to-payment records registered against this amount. The pie measures this collection only. Actual DOE project funding reported by GAO.
Only invoice and payment records tied to this same amount and scope count. Delivery coverage also requires a linked acceptance record. A report showing a total does not count as an individual receipt.
- Invoice, payment and delivery linked
- $0
- Invoice and payment linked; delivery not linked
- $0
- No matched invoice and payment in this file
- $153,428,898
0 matching invoice/payment records; 0 also link to delivery.
No individual invoice-to-payment records are registered in this file yet. This does not establish that those records do not exist elsewhere.
What is still missing?
Which completed designs and other work supported the payments, and what happened to them afterward?
Which records would help answer this?
Award totals and stage are documented; invoice-level acceptance and final recovery records are not assembled here.
- Connect federal reimbursements and utility payments to invoices, work packages and accepted engineering milestones.
- Publish final termination costs, recovery amounts and the disposition or reuse of equipment and facilities.
- Separate taxpayer funding, ratepayer charges and private investment in a reconciled ledger.
These records have not all been assembled here. They may exist elsewhere. Personal details should stay protected.
Can we estimate how much was wasted or stolen?
This file does not establish an independent value for everything delivered. Subtracting a guessed value from a headline amount would not establish fraud. A sound estimate needs matching costs, delivered results and evidence about why any money was lost.
Sources and research notes (2 documents)
These documents support the case. A source document can describe many payments; it is not itself an itemized receipt.
- GAO-22-105111, tables 1 and 3
gao.gov · 2021-12
- DOE 2013 HECA audit